Corvo v. City of Waterbury

109 A.2d 869, 141 Conn. 719, 1954 Conn. LEXIS 250
CourtSupreme Court of Connecticut
DecidedDecember 8, 1954
StatusPublished
Cited by18 cases

This text of 109 A.2d 869 (Corvo v. City of Waterbury) is published on Counsel Stack Legal Research, covering Supreme Court of Connecticut primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Corvo v. City of Waterbury, 109 A.2d 869, 141 Conn. 719, 1954 Conn. LEXIS 250 (Colo. 1954).

Opinion

Daly, J.

The plaintiffs brought this action to recover damages for injury to their property, alleged to have been caused by the defendants through their maintenance of a nuisance and their failure to maintain and repair a retaining wall. The defendants Vincenzo Festa, Antonette Festa, Antonio Silverino and Anthony DiMasi, hereinafter called the defendants, hied counterclaims in which they sought equitable relief. They claimed that they were entitled to have their land supported and that the failure of the plaintiffs and of the defendant city of Waterbury to furnish the required support violated a legal duty imposed upon them.

The pertinent facts are as follows: The plaintiffs were the owners of land and a three-family dwelling house at 54 French Street in Waterbury. The premises owned by the defendants were to the rear of, and substantially higher than, the plaintiffs’ property. They were located on the southerly side of Grove Street. Between them and the plaintiffs’ property there was a wall approximately sixty feet high. The Festas owned and lived on the premises known as 345-347 Grove Street. DiMasi and Silverino owned the property at 339-341 Grove Street. Originally, a passway divided the French Street lots from the lots now owned by the defendants. This passway, 20 feet wide, extended 200 feet east from Gilbert Street, which runs north and south and at an angle to French Street. The passway was reserved in 1853 by Isaac Baldwin, who owned all the property and was then dividing it into lots. When the Festa and DiMasi-Silverino houses were built, the only access *722 to them was through the passway. After 1891, however, the main entrance to these houses was from Grove Street. In 1921 the owners of the land eventually acquired by the Festas took down a small wall back of their property and erected a retaining wall. Sixty feet high, this retaining wall was on the pass-way; it was north of the land subsequently purchased by the plaintiffs, and south of that now owned by the defendants. It was built to prevent the higher land from disintegrating and sliding down onto the lower land. It also served as the southerly boundary line of the back yards of the properties now owned by the defendants, and it was considered by the plaintiffs to mark the northerly boundary of their property.

After the wall had been built, the then owners of the Festa land filled in dirt north of the wall and put a fence on top of it. Ingress to and egress from the passway was thus prevented. A veranda was built so that it extended into the passway in a southerly direction toward the wall. The filled-in land, between the house and the wall, was utilized for the planting of flowers, trees and grapevines and served, at the time of trial, as a rear yard for the Festa property. The predecessors in title of the defendants DiMasi and Silverino built upon the passway a dry wall which joined with the high wall maintained by the Festas. This completely inclosed the passway and cut off access to it. The land so inclosed became the back yard of the property of the defendants DiMasi and Silverino. They have used the area north of the wall as a garden for themselves and their families. They have continually used the land from their house to the wall as their own and have asserted and maintained control of the inclosed passway. It was impossible to determine, at the time of trial, with *723 any degree of certainty who had title to the twenty-foot strip originally used as a passway. The defendant city was never the owner of it, nor was it ever accepted as a public highway.

On December 31, 1948, a part of the wall behind the defendants’ property gave way, sending dirt, boulders and other debris into the back yard and house of the plaintiffs. A dry wall which stood on the plaintiffs’ property seven feet north of their house remained intact, but upon orders from the fire marshal the plaintiffs employed a contractor and had this wall braced in order to safeguard the lives of those living in their house. The removal of the dirt and rocks, the work ordered by the fire marshal as a protective measure, and the repair of the damage to the plaintiffs’ house cost $569.31. Part of the retaining wall remained standing, but it had become so cracked that its condition was dangerous and a menace to the plaintiffs’ safety.

The court concluded that the defendants have used, maintained and asserted ownership of the land up to and including the wall south of their premises; that they have asserted and maintained control of the inclosed passway; that they were using the property north of the wall for their exclusive use and were liable for the repair of the wall; that they, having taken possession of the land burdened with the wall, were charged with the maintenance of the artificial structure; that they, in controlling, maintaining and asserting ownership of this land, have permitted surface water to flow from their premises in a manner different in volume and course from its natural flow and have weakened the already overburdened land, causing the wall to give way; that they were liable for permitting and allowing the dirt, stones and debris to wash onto the plaintiffs’ land, causing dam *724 age; that they failed to keep the retaining wall in proper condition and repair; that they were not entitled to prevail on their counterclaims; that the existing condition constituted a nuisance; that the plaintiffs were entitled to recover $569.31 in damages from the defendants and to obtain equitable relief requiring them to rebuild and repair the retaining wall so as to provide adequate support and to prevent foreseeable future damage; that no liability attached to the city of Waterbury and it was entitled to judgment; and that all equitable considerations favored the position of the plaintiffs.

In the assignment of errors the assertion is made that the court erred in refusing to find many facts claimed to have been admitted or undisputed. A fact not contradicted does not necessarily become an “undisputed” fact which is required to be added to the finding. The trial court is the final judge of credibility and may disbelieve a witness as to part of his testimony and accept it in other respects. Clark v. Haggard, 141 Conn. 668, 674, 109 A.2d 358; Chouinard v. Zoning Commission, 139 Conn. 728, 730, 97 A.2d 562; Armstrong v. Watrous, 138 Conn. 127, 129, 82 A.2d 800; Neville v. Yaknunas, 132 Conn. 627, 630, 46 A.2d 342; Cishowski v. Clayton Mfg. Co., 105 Conn. 651, 655, 136 A. 472; Practice Book §397. Many claims are made, in the assignment of errors, that the court erred in finding facts without evidence. None of the relevant facts contained in the finding were found without evidence.

The defendants, who are the appellants, maintain that they were not the owners of the passway and consequently were not liable.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Snyder v. Hamdor Properties, No. Cv 02 0461333 S (Sep. 19, 2002)
2002 Conn. Super. Ct. 11990 (Connecticut Superior Court, 2002)
Windecker v. the Roscoe Family L.P., No. Cv00-05040235 (Jun. 14, 2002)
2002 Conn. Super. Ct. 7894 (Connecticut Superior Court, 2002)
Suarez v. Long, No. 380763 (Aug. 24, 2000)
2000 Conn. Super. Ct. 9789 (Connecticut Superior Court, 2000)
Zercie v. Vantage Point Condominium Association, No. 398828 (Apr. 5, 2000)
2000 Conn. Super. Ct. 4147 (Connecticut Superior Court, 2000)
Cyr v. Sheppard, No. Cv 940 532649 S (Oct. 6, 1999)
1999 Conn. Super. Ct. 13505 (Connecticut Superior Court, 1999)
Jedziniak v. Safdie, No. Cv96 033 52 68 (Feb. 8, 1999)
1999 Conn. Super. Ct. 1442 (Connecticut Superior Court, 1999)
Esposito v. Toys "R" US, No. 382699 (Dec. 26, 1997)
1997 Conn. Super. Ct. 12837 (Connecticut Superior Court, 1997)
Cyr v. Sheppard, No. Cv-94-0532649-S (Nov. 29, 1996)
1996 Conn. Super. Ct. 10101 (Connecticut Superior Court, 1996)
Santana v. City of Hartford, No. Cv92-0513389-S (Apr. 28, 1994)
1994 Conn. Super. Ct. 3894 (Connecticut Superior Court, 1994)
Starr v. Commissioner of Environmental Protection
627 A.2d 1296 (Supreme Court of Connecticut, 1993)
Center Drive-In Theatre, Inc. v. City of Derby
352 A.2d 304 (Supreme Court of Connecticut, 1974)
Farlow v. Andrews Corporation
224 A.2d 546 (Supreme Court of Connecticut, 1966)
Henriques v. Rockefeller
173 A.2d 596 (Supreme Court of Connecticut, 1961)
Vitale v. Gargiulo
131 A.2d 830 (Supreme Court of Connecticut, 1957)
State v. Coulombe
124 A.2d 518 (Supreme Court of Connecticut, 1956)

Cite This Page — Counsel Stack

Bluebook (online)
109 A.2d 869, 141 Conn. 719, 1954 Conn. LEXIS 250, Counsel Stack Legal Research, https://law.counselstack.com/opinion/corvo-v-city-of-waterbury-conn-1954.