This text of 327 F. Supp. 720 (Continental Cas. Co. of Ill. v. Westinghouse Elec. Corp.) is published on Counsel Stack Legal Research, covering District Court, E.D. Michigan primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Continental Cas. Co. of Ill. v. Westinghouse Elec. Corp., 327 F. Supp. 720, 1970 U.S. Dist. LEXIS 12522 (E.D. Mich. 1970).

Opinion

OPINION

ROTH, District Judge.

This is a subrogation action by three plaintiff insurers against two defendants, Westinghouse Electric Corporation and Edwin L. Wiegand Corporation (hereinafter referred to as Westinghouse and Wiegand), to recover moneys paid by them as a result of a fire at WJRT-TV, a television station with related offices, located at Flint, Michigan.

The two-count complaint pleads breach of express and implied warranties and negligence of both defendants in furnishing WJRT-TV a heating-air conditioning unit manufactured by Westinghouse, containing a component heating element manufactured and supplied by Wiegand — which heating-air conditioning unit caused the fire and consequent losses complained of.

There are certain undisputed facts: Westinghouse manufactured and sold the combination heater-air conditioner unit, which was installed in a secretary’s office in a newly constructed administrative wing at WJRT. (Fifteen other like units were installed in the building.) One of the component parts of the unit was a 3,000 wattspiral electric resistance heater, manufactured by Wiegand and sold to and installed by Westinghouse in the unit in question. The said unit was installed under the window in the room, which was used principally as a storeroom and which was not occupied by anyone until the week preceding the fire. The fire occurred at about 8:00 a. m. on Saturday, March 5, 1966. During that work week, i. e., Monday through Friday, March 4, the room was used by an accountant; Friday, he left the room at approximately 5:30 to 6:00 p. m.

It is stipulated that Charles and La-rue Pemberton owned the building occupied by WJRT-TV as tenant; that plaintiffs are possessed of the subrogation rights; and, that the amounts paid by the plaintiffs are as follows:

Continental Casualty Company ...... $205,083.68
Ohio Farmers Insurance Company .... $ 33,309.99
Phoenix Assurance Company........ $ 8,882.66

It is further stipulated that if plaintiffs are entitled to recover, they are entitled to recover in the amounts stated.

*722 The parties are agreed that there was arcing in the heating element manufactured by Wiegand. The dispute between the parties centers on what caused the fire and, by the same token, what caused the arcing.

It is the theory of the plaintiffs, joined by Westinghouse, that the heating element manufactured by Wiegand was defective when delivered to Westinghouse by reason of a defective or “marginal” weld of an end pin and the heating wire, or that there was present some foreign material in the area of the weld. They contend that because of the defective weld or foreign substance an internal arc developed at the weld, generating a tremendous amount of heat and energy within the sheath, causing a breakdown of the magnesium oxide insulation so that the arc reached the sheath, causing the expulsion of extremely hot gasses and molten metal particles, which then came into contact with the polyurethane filter, igniting the same and causing the ensuing fire damage.

It is the theory of the defendant Wiegand that Westinghouse was negligent in the design and manufacture of the unit in the following respects: that it improperly employed a flammable polyurethane filter; that it utilized flammable ABS plastic in its grilles; that the air flow over the thermostatic sensing bulb was restricted; that the chamber of the unit was improperly designed; and, that the over-temperature limit switch was improperly located upstream of the heating element. From these premises Wiegand reasons that the fire originated external to the heating element; that the limit switch was defective and did not work, as a result of which intense heat was generated causing the arcing; and, that the arcing did not occur at the weld.

There was considerable dispute as to whether the drapes, which could be drawn across in front of the unit, were in a closed position. Under the evidence we conclude that they were open at the time of the fire. As for the limit switch, we conclude that it was in working order, especially in view of the fact that months later, it responded to tests at Chromalox Laboratories, albeit at a higher calibration than would have been normal. If an external fire had caused the heating element to rupture, and we speak now of a buildup of some 1600 degrees, there would have been severe damage evident in the control panel. There was, however, no damage inside the control panel, located immediately to the left of the heating chamber: the paper diagram of the wiring circuitry is intact, with a slight browning along the right side thereof; there is no damage to the wiring in the control area; and, there is no evidence of melting or burning of bakelite parts, or of the aluminum face plate.

The x-rays of the cold pin and the heating wire near the rupture or eruption point indicate that a part of the weld portion of the heating wire is missing. With regard to this weld, defendant Wiegand’s proofs were to the effect that the heating wire and the cold pin were brought together by a spot weld. This part of the manufacturing process was performed manually by an operator working on a normal production schedule of 400 welds per hour. Only one out of each hundred heating elements was subjected to a pull test.

The probabilities are, on the evidence before us, that the spot weld, connecting the heating wire to the cold pin, was defective on the unit in question, and we so find. We further find that because of the defective weld an arcing developed inside the sheath, leading in turn to a rupture of the sheath and the expulsion, at high velocity, of particles of molten metals, hot magnesium oxide and gasses which, coming into contact with the polyurethane filter and the plastic grille, caused them to burn, setting fire to the drapes and, by progression, the other material in the room and building.

On the evidence we hold that the conduct of Wiegand was the primary and efficient cause of the injury, i. e. that it was the sole, primary and proximate cause of the fire.

*723 With respect to Westinghouse, we hold that it was its duty to use due care in constructing the unit and to see to it that it was properly equipped so that it could safely be used for its intended purpose and would not be a menace to those who used it. While we hold that the defect in the heating element supplied by Wiegand was not such as to have been discoverable by the exercise of due care by Westinghouse and that, therefore, its failure to discover the defect was not negligence, we conclude, under the authority of the leading Michigan case on the subject, Piercefield v. Remington Arms Co., 375 Mich. 85, 133 N.W.2d 129, that Westinghouse is liable to the plaintiffs for breach of implied warranty of the unit of its fitness for its intended purpose and use.

Under Piercefield the burden is upon the plaintiffs in a case like this to “prove (a) the defect of manufacture upon which he relies, and (b) injury or damage caused by or resulting from such defect.” In Piercefield the Court cited Picker X-Ray Corp. v.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Eaton Corp. v. Magnavox Co.
581 F. Supp. 1514 (E.D. Michigan, 1984)
Signal Oil & Gas Co. v. Universal Oil Products
572 S.W.2d 320 (Texas Supreme Court, 1978)
Williams v. Detroit Edison Co.
234 N.W.2d 702 (Michigan Court of Appeals, 1975)
McGUIRE v. NELSON
Montana Supreme Court, 1973
Continental Casualty Co. v. Westinghouse Electric Corp.
327 F. Supp. 723 (E.D. Michigan, 1970)

Cite This Page — Counsel Stack

Bluebook (online)
327 F. Supp. 720, 1970 U.S. Dist. LEXIS 12522, Counsel Stack Legal Research, https://law.counselstack.com/opinion/continental-cas-co-of-ill-v-westinghouse-elec-corp-mied-1970.