Concord v. Peerless Insurance

272 A.2d 588, 110 N.H. 497, 1970 N.H. LEXIS 210
Supreme Court of New Hampshire·Decided December 30, 1970·No. 6101·Published·Cited by 7 cases

Opinion

*498 Lampron, J.

Action by the city of Concord to recover on a bond issued by the defendant to indemnify plaintiff for loss caused by the failure of Thomas Pingree, its personnel and purchasing director, “to perform faithfully his duties.” The breach relied on is Pingree’s failure to request the Labor Commissioner to determine, in accordance with RSA ch. 280, the minimum wage rates to be paid in the construction of two municipal buildings. The builder thereof has recovered against the city a judgment of $3,926 plus interest and costs in an action for failure to obtain and include such minimum wage rates in its advertisement for bids on the projects in question in accordance with the requirements of RSA 280:2.

Defendant filed a motion to dismiss plaintiff’s action on the ground that it is based on a loss allegedly caused by the negligent conduct of Pingree which is not insured under defendant’s bond. Plaintiff’s exception to the granting of this motion was reserved and transferred by Flynn., J.

Meanwhile plaintiff instituted a new suit against the defendant with a declaration substantially identical to that in the previous action except that it specifically characterized Pingree’s conduct which caused the loss as a “ breach of faithful performance. ” Defendant moved that this action be abated as a second suit for the same cause of action and that it be dismissed on the ground stated in its previous motion to dismiss as well as on other grounds. Plaintiff excepted to the granting of this motion and its exception was reserved and transferred. However the latter exception was neither briefed nor argued by the plaintiff and is considered waived. Bartis v. Bartis, 107 N.H. 34, 37, 216 A.2d 784, 786 (1966).

The main issue to be decided is whether if the declaration in plaintiff’s first action seeks to recover for a loss resulting from the negligent conduct of its employee Pingree in the discharge of his official duties it states a cause of action against the defendant who insured the city under its bond for loss caused by Pingree’s failure “to perform faithfully his duties. ”

RSA 280:1 provides that the rate per hour of the wages paid to certain specified persons employed in the construction of public works by a city “ shall not be less than the rates of wages to be determined by the labor commissioner. ” RSA 280:2 requires that “[a]t least ten days before asking for bids the authorized officials or agency prescribing specifications shall request the labor commissioner to determine the minimum wage rates as *499 provided in section 1. ” It also provides that in advertising for bids “die awarding official, or public body, shall incorporate said schedule in the advertisement or call for bids ...” which schedule shall be made a part of the contract. RSA 280:4 provides that “[w]hoever shall willfully pay less dian said rates . . . shall forfeit to the commissioner a sum equal to twice the difference between the determined rates and the wages actually paid to said employees. ...”

It is clear diat this statute imposed a positive duty on an official of the city of Concord to obtain a schedule of such minimum wage rates and to incorporate it in the advertisement for bids on public works and to make it a part of the construction contract. Union School District v. Comm’r of Labor, 103 N.H. 512, 515, 176 A.2d 332, 335 (1961). Plaintiff’s declaration alleges that a failure to comply with this statutory duty in two instances caused the losses for which it seeks recovery.

Plaintiff’s declaration also alleges that “[t]he responsibility for obtaining wage rates and notifying the contractor and all other City officials was vested in die Personnel & Purchasing Director, Mr. Thomas Pingree. ” In considering the propriety of granting defendant’s motion to dismiss, the facts alleged in plaintiff’s pleadings are to be considered as true and are to be construed most favorably to the plaintiff. Cote v. Litawa, 96 N.H. 174, 175, 71 A.2d 792, 793 (1950). The statutory obligation imposed on the city by RSA ch. 280 and the allegation that the duty to comply devolved on Pingree by virtue of bis office become material factors in assessing Pingree’s “faithful performance” which defendant was insuring by its bond. 4 Mc-Quillin, Municipal Corporations ss. 12.224, 12.224a (rev. vol. 1968); Rhyne, Municipal Law s. 8-35, at 171, 172 (1957). See Paisner v. Renaud, 102 N.H. 27, 29, 149 A.2d 867, 869 (1959); Rivier College v. St. Paul Fire Lns. Co., 104 N.H. 398, 401, 187 A.2d 799, 802 (1963 ); Totowa v. American Surety Co., 39 N.J. 332, 343, 188 A.2d 586, 592 (1963); Cf. City of Lowell v. Stiles, 232 Mass. 341, 342, 122 N.E. 412, 413 (1919 ). The rule which governs the interpretation of a contract of insurance prevails in this situation. Insurance Company of North America v. Tucker, 262 A.2d 489, 490 (Vt. 1969); 28 Ins. Counsel J. 210 (1961). Therefore the defendant’s obligation under its bond is to be determined not by what the insurer intended the clause to mean but by what a reasonable person in the position of the named insured would have understood it to *500 mean. Standard &c. Ins. Co. v. Swift, 92 N.H. 364, 367, 31 A.2d 66, 68 (1943 ); McCaffery v. St. Paul Fire Ins. Co., 108 N.H. 373, 375, 236 A.2d 490, 492 (1967).

Free access — add to your briefcase to read the full text and ask questions with AI

Concord v. Peerless Insurance, 272 A.2d 588, 110 N.H. 497, 1970 N.H. LEXIS 210 (N.H. 1970).

272 A.2d 588 (Concord v. Peerless Insurance) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

City of Burlington v. Western Surety Co.
599 N.W.2d 469 (Supreme Court of Iowa, 1999)
Ekco Enterprises, Inc. v. Remi Fortin Construction, Inc.
382 A.2d 368 (Supreme Court of New Hampshire, 1978)
Town of Derry v. Simonsen
380 A.2d 1101 (Supreme Court of New Hampshire, 1977)
Preston v. National Grange Mutual Insurance
317 A.2d 787 (Supreme Court of New Hampshire, 1974)
Seppala 7 Aho Construction Co. v. City of Nashua
306 A.2d 760 (Supreme Court of New Hampshire, 1973)