Cleveland, Cincinnati, Chicago & St. Louis Railway Co. v. Kline

63 N.E. 483, 29 Ind. App. 390, 1902 Ind. App. LEXIS 155
CourtIndiana Court of Appeals
DecidedApril 1, 1902
DocketNo. 3,513
StatusPublished
Cited by4 cases

This text of 63 N.E. 483 (Cleveland, Cincinnati, Chicago & St. Louis Railway Co. v. Kline) is published on Counsel Stack Legal Research, covering Indiana Court of Appeals primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Cleveland, Cincinnati, Chicago & St. Louis Railway Co. v. Kline, 63 N.E. 483, 29 Ind. App. 390, 1902 Ind. App. LEXIS 155 (Ind. Ct. App. 1902).

Opinion

RoBiirson, P. J.

Action for damages for obstructing a watercourse. Appellee’s complaint avers that she owns in fee sixty-five acres of land adjoining appellant’s right.of way; that a water'course flows through this land and was originally crossed by appellant’s track upon a trestle fifty to sixty feet long and about twelve feet high; that appellant “completely and fully filled in all the space between said trestle and bridge with earth, timbers, and stone, excepting an iron sewer-pipe sixty inches in diameter and thirty-six feet in length; that said fill and embankment now constitute a part of the grade and roadbed upon which the ties and track rest, and which said fill and embankment js about thirty-six feet in width at the bottom, and about fourteen feet in width at the top, and is so constructed and built of earth, stone, and timbers as to be a part of the permanent fill and roadbed, and a permanent embankment upon which rests the timbers, ties, and track, and which said fill and embankment is permanent and continuous, and has been maintained in said condition by said defendant since October, 1897, and is now a part of the permanent roadbed of said railroad, and is so recognized as a permanent and fixed improvement and embankment and structure, and as a part of the fixed and permanent grade and roadbed of the defendant by both the plaintiff and defendant.” It is further averred that the bottom of the sewer-tile was placed about six inches above the original bed of the stream, and that it is too small to carry the water that flows in the stream “at wet or rainy seasons of the year, and in times of high water;” that the appellant negligently and carelessly placed the tile above the bed of the stream, and at right angles with the track and fill, whereas the water flowed in its natural bed diagonally across the right of way and under the trestle; that by reason of placing the tile above the bed of the stream, and the company’s negligence in placing a tile too small to carry the water in rainy seasons and in times of ordinary floods, [392]*392and placing the tile at a different angle from that of the thread of the stream, and by making the fill, appellant had negligently and carelessly caused the water to be dammed up against the fill, and to back up and flow over and through appellee’s lands, washing ditches and ravines therein, and rendering from three to six acres of the lands practically useless for farming purposes; that the water had cut and washed away large quantities of the soil, and would continue to cut and wash away large portions of ths land, and had washed away fences, and would continue to do the same, and that before the construction of the fill and embankment the water at no time flowed over and across appellee’s land, but since the construction thereof, in wet seasons of the year and in all times of high water, the water is obstructed by the fill and will continue to be so obstructed, overflowing and washing away large portions of her land; that because of the construction of the embankment and the obstruction of the flow of water, appellee’s land has been permanently injured and damaged, all without appellee’s fault.

The case made by the pleading rests upon the theory that the injury complained of resulted to appellee’s land only at wet or rainy seasons of the year, and in times of high water; 'that the overflow was the result of an increased volume of water at these particular times in connection with the insufficient pipe. This being true, the act itself of constructing the embankment with the particular pipe gave no right of action. The construction of the embankment with the opening as charged did not constitute a nuisance. It was only when it diverted the water from rainfall from its usual flow, upon the landowner, that it became a nuisance. Appellant had the right to construct its road upon its own right of way, and it had the right to make its roadbed of earth and stone at that particular place. And it could make no difference to the adjoining landowner, so far as shown by the pleading, how negli[393]*393gently this was done, so long as such landowner suffered no damage from it. Appellant committed no act that could have been complained of as. a trespass. If it had, a right of action would have accrued as soon as the trespass was committed. The embankment and opening may have been negligently and unskilfully made, but that fact of itself gave appellee no right of action. Appellee’s cause of action first arose when her land was damaged, and she had no right to sue until she was damaged. She could not have sued before her land was flooded, upon the idea that at some future time it might be flooded. It is true the wrong of appellant was the negligent construction and maintenance of the opening; but this wrong, to constitute a cause of action, must be combined with appellee’s right to damages, which could arise only when her lands were flooded at rainy seasons or times of high water. There must be a concurrence of wrong and damage to give appellee a right of action.

In Sherlock v. Louisville, etc., R. Co., 115 Ind. 22, 37, in discussing the sufficiency of a paragraph for damages, the court said: “That the bridge would be negligently constructed, or, if so constructed, that it would at any time cause injury and damage by causing the stream to overflow the lands outside of the right of way, could not have been sufficiently known until such an overflow occurred to authorize the assessment of damages in advance. And, assuming that such an overflow might be occasioned by the bridge, it would be impossible, in advance of such overflow, to make even an approximately correct estimate of the damages that might result. When the injury did occur by reason of such overflow, it was not the probable and proximate result of the construction of the road, but the result of an act of negligence, in connection with more than a usual amount of water in the stream.”

Tt is true the embankment is, in a sense, of a permanent character; but, to entitle appellee to recover in one action [394]*394more than the damage already accrued, it must be shown that the insufficient opening necessarily causes permanent injury to the value of the property. “Where the structure,” said the court in Valparaiso, etc., Co. v. Dickover, 17 Ind. App. 233, “maintained by the defendant, by the use of which the nuisance is created, is of a permanent character, but the nuisance itself is not of a permanent character, and the use in question may or may not be injurious, the rule that but one action will lie in which the plaintiff may recover all damages, — past and prospective,— does not apply, but the recovery will be for the damage only which has accrued to the date of the commencement of the action. Gould on Waters (2d ed.), §416.”

Although the act -complained of in the complaint is of a permanent nature, its continuance is not necessarily injurious. It may belor may not be injurious, and it may or may not be continued. In 3 Sutherland on Dam. (2d ed.), §1046, the author reviews the authorities and concludes: “We agree with the Tennessee court that The true rule deducible from the authorities is that the law will not presume the continuance of a wrong, nor allow a license to continue a wrong, when the cause of the injury is of such a nature as to be abatable, either by the expenditure of labor or money; and that where the cause of the injury is one not presumed to continue, that the damages recoverable from the wrongdoer are only such as have accrued before action brought, and that successive actions may be brought for the subsequent continuance of the wrong or nuisance’ ”. Nashville v.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Dolph v. Mangus
400 N.E.2d 189 (Indiana Court of Appeals, 1980)
Southern Railway Co. v. Weidenbrenner
109 N.E. 926 (Indiana Court of Appeals, 1915)
Southern Railway Co. v. Poetker
91 N.E. 610 (Indiana Court of Appeals, 1910)
Baltimore & Ohio Southwestern Railroad Co. v. Quillen
72 N.E. 661 (Indiana Court of Appeals, 1904)

Cite This Page — Counsel Stack

Bluebook (online)
63 N.E. 483, 29 Ind. App. 390, 1902 Ind. App. LEXIS 155, Counsel Stack Legal Research, https://law.counselstack.com/opinion/cleveland-cincinnati-chicago-st-louis-railway-co-v-kline-indctapp-1902.