City of Boston v. Boston Elevated Railway Co.

100 N.E. 601, 213 Mass. 407, 1913 Mass. LEXIS 980
CourtMassachusetts Supreme Judicial Court
DecidedJanuary 29, 1913
StatusPublished
Cited by3 cases

This text of 100 N.E. 601 (City of Boston v. Boston Elevated Railway Co.) is published on Counsel Stack Legal Research, covering Massachusetts Supreme Judicial Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
City of Boston v. Boston Elevated Railway Co., 100 N.E. 601, 213 Mass. 407, 1913 Mass. LEXIS 980 (Mass. 1913).

Opinion

Sheldon, J.

The Boston Transit Commission, in accordance with the requirement of St. 1897, c. 500, § 17, constructed a tunnel running from Boston proper to East Boston. That section, so far as now material, reads as follows: “The Boston Transit Commission shall construct a tunnel or tunnels, of sufficient size for two railway tracks, with approaches, entrances, sidings, stations and connections therefor, and for the running of railway cars therein, from a point on or near Hanover Street in the city of Boston, or such other point or points as said board may deem proper for a suitable connection- with the subway or súbways provided for” in another statute, “to a point at or near Maverick Square in that part of Boston called East Boston, where a suitable connection with surface tracks may be made. Said tunnel or tunnels shall be constructed in a thorough and substantial manner, with special reference to strength, durability and safety for railway travel, and shall be water tight, or in case of leakage the water shall be taken care of by said city.” The section then enacts that the tunnel when completed shall be leased to the defendant. Section 18 of the same statute provided for the issue of bonds by the city of Boston, the proceeds of which should be applied to pay “the cost and expenses of constructing” certain other subways “and of the tunnel or tunnels . . . provided for in the preceding section, and the stations, inclines and steps in connection therewith.” In the tunnel the Transit Commission constructed a station near the corner of Atlantic Avenue and State Street, and at each end of the station put in a stairway running to the surface of the street. The Commission constructed also at this station elevator shafts or wells, adapted and intended for four large elevators running from the floor of the tunnel not only to the surface of the street, but also to a landing fourteen feet above that surface and connected with a station on the defendant’s elevated railway. The commission [411]*411built and paid for this station both above and below ground, the elevator wells or shafts, and the stairways which have been mentioned. There was no dispute that it was for the defendant to lay the railway tracks in the tunnel, to install the electrical apparatus necessary for the running of its cars, and generally to provide the equipment for the operation of its railway therein. The commission and the defendant under these circumstances could not agree which party was to provide and install the elevators themselves; and desiring to avoid delay, and assuming that elevators were so essential to the convenient use by passengers of the station that some party was bound to furnish them, they agreed that this should be done by the commission, and that the cost thereof should be repaid by the defendant if it should be found to be liable therefor. This was accordingly done by the commission, at an expense of more than $40,000 and the present action is brought to recover that amount from the defendant. The precise question presented is whether, taking the tunnel and station together, as they actually have been built, these elevators are, within the meaning of the statute which has been quoted, properly a part of the tunnel or of the approaches, entrances, stations and connections therefor which the act requires the commission to provide at the expense of the plaintiff, or whether they are merely equipment of the railway or appurtenances thereof which the defendant must install at its owm expense.

A preliminary question is whether, after it has been determined what is the character of the instrumentalities in question, and whether or not the means of access to the tunnel and the station which they afford are reasonably necessary for that purpose, the point is to be determined as an isssue of law or of fact. That question in our opinion is settled in principle by the decision in Selectmen of Natick v. Boston & Albany Railroad, 210 Mass. 229, 232. As in that case, the question here is as to the meaning of the words used in the statute; and that is a question of law. And in Browne v. Turner, 174 Mass. 150, 161, the court determined the meaning of the word “connection” in this very statute as a question of law. So in this case, it being settled just what these particular structures or articles of mechanism are, just what purpose they are intended and fitted to serve, and whether or not that use is both designed and adapted and reasonably necessary for the pur[412]*412poses prescribed by the statute, it becomes a pure question of law whether that structure or that piece of mechanism is or is not a part of the tunnel, its approaches or entrances.

The character of this elevator plant, including the cars and the machinery by which they are operated, is not in dispute. That the whole plant is reasonably necessary for the accommodation of the public, to afford access to and departure from the tunnel, was found as a fact. That this finding was fully warranted has not been denied, and indeed is hardly open to dispute. It seems to have been assumed by both parties. It is manifest enough that the stairways at the east and west ends of the station, with their restricted width, their great length, and the small number of their breaks or platforms, do not furnish a convenient means of access to the station, and often might be wholly insufficient for that purpose. It may be doubted whether any stairways could be regarded as adequate approaches or entrances to a tunnel sixty feet underground. But this question need not be discussed; it is concluded by the finding that has been made.

It is, as it must be, undisputed that the stairways are “approaches” or “entrances” within the meaning of those words as used in the statute. It is plain too that when it was seen that the two stairways provided did not furnish sufficient means of entrance, the duty of the Transit Commission was not fulfilled, but it was incumbent upon them to provide further entrances’ or approaches. If instead of constructing elevator shafts they had chosen to put in moving sidewalks or escalators, these certainly would have been included within the words of the statute. But. such moving sidewalks would not have served their purpose, would not have been capable of use in the manner intended and with the convenience to the travelling public which was aimed at, unless with them and as a part of their construction was furnished also the mechanism by which they could be operated. An elevator shaft without a car to run therein and machinery by which to operate it is wholly useless; it is no entrance at all; it becomes an entrance only when suitably fitted up and supplied with the means by which alone it can be made to serve as an entrance. It is only the completed plant that can be used as an entrance; the completed plant therefore must be included in that word.

The object of the whole body of legislation of which the statute [413]*413before us is a part was, as was said in Browne v. Turner, 174 Mass. 150,162, “to secure rapid transit in Boston and vicinity, and to reduce the congestion in the streets by means of a system of subways and tunnels;” or in other words, as stated in Mahoney v. Boston, 171 Mass. 427, 429, “to promote the convenience of the inhabitants of Boston, and of the public generally, by furnishing increased accommodations for public travel.” This object could not be wholly accomplished in the case of a station like this situated sixty feet underground, with no room available for access by easy slopes, without the use of elevators.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Smith v. Boston Elevated Railway Co.
159 N.E. 501 (Massachusetts Supreme Judicial Court, 1928)
Hill v. Minneapolis, St. Paul & Sault Ste. Marie Railway Co.
200 N.W. 485 (Supreme Court of Minnesota, 1924)
City of Cambridge v. Boston Elevated Railway Co.
241 Mass. 374 (Massachusetts Supreme Judicial Court, 1922)

Cite This Page — Counsel Stack

Bluebook (online)
100 N.E. 601, 213 Mass. 407, 1913 Mass. LEXIS 980, Counsel Stack Legal Research, https://law.counselstack.com/opinion/city-of-boston-v-boston-elevated-railway-co-mass-1913.