City of Alexandria v. Ratcliffe Construction Co., LLC

95 So. 3d 1076, 11 La.App. 3 Cir. 1200, 2012 La. App. LEXIS 167, 2012 WL 385136
CourtLouisiana Court of Appeal
DecidedFebruary 8, 2012
DocketNo. 11-1200
StatusPublished
Cited by2 cases

This text of 95 So. 3d 1076 (City of Alexandria v. Ratcliffe Construction Co., LLC) is published on Counsel Stack Legal Research, covering Louisiana Court of Appeal primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
City of Alexandria v. Ratcliffe Construction Co., LLC, 95 So. 3d 1076, 11 La.App. 3 Cir. 1200, 2012 La. App. LEXIS 167, 2012 WL 385136 (La. Ct. App. 2012).

Opinion

COOKS, Judge.

| jThis appeal is before this court as a result of the trial court’s granting of summary judgment in favor of appellees and dismissing appellant’s claims against ap-pellees for damages from negligence allegedly resulting from a defective design. For the following reasons, we affirm.

FACTS AND PROCEDURAL HISTORY

This suit involves the design and construction of the Coughlin Saunders Performing Arts Center (hereafter the Center) located in Alexandria, Louisiana, which opened in August of 2004. On June 29, 2009, the City of Alexandria filed suit against Ratcliffe Construction Company, LLC, who built the Center. Also named as defendants were the architects of the Center, Ashe Broussard Weinzette Architects, LLP and Witsell Evans & Rasco, PA (hereafter the Architects).

The City alleged that subsequent to the Center’s completion, it “sustained rainwater intrusion in several locations, through its masonry wall systems.” The City contended the rainwater intrusion and corresponding damage was the direct result of [1078]*1078the defective workmanship of Ratcliffe Construction and the negligent design of the Architects. The City requested damages and attorney fees.

After the damage was discovered, the Architects investigated the cause of the rainwater intrusion and made recommendations for repair. The City then hired a consultant, Quick & Associates, to inspect the building and determine the cause of the rainwater intrusion and to assess the design and quality of workmanship.

On October 2, 2006, Quick & Associates issued a written report of its findings. It concluded the leaks were a direct result of the faulty workmanship and poor supervision by the masonry subcontractor and general contractor. Quick & Associates also found that the design of the Center was in accordance with industry standards.

12Quick & Associates determined that repairs and remedial work would be necessary in order to mitigate the damages and eliminate any rainwater intrusion in the future. It was recommended that the original project architects prepare and issue remedial drawings based on the original construction plans and details. Despite the pending suit for damages, the Architects then prepared and issued remedial drawings to the City.

Relying on the conclusions reached by Quick & Associates, the Architects filed a motion for summary judgment contending there was no genuine issue regarding the material fact that their design of the center met applicable industry standards and was not defective. Additionally, the Architects asserted the City could not recover attorney fees in any event, because neither the contract between the parties nor a statute provided for the recovery of attorney fees.

The City opposed the motion for summary judgment, arguing it was inappropriate at that stage of the litigation because adequate discovery had not yet been conducted.

After a hearing on the motion, the trial court found summary judgment in favor of the Architects was “warranted in this matter because the City’s own consultant and expert opined that the design of the Center was not defective.” The trial court further found the summary judgment was not premature, noting the Architects obtained an opinion letter from the City’s expert stating that the design of the Center was not defective, and the City failed to produce any expert testimony and/or reports to the contrary. The trial court also found the City could not recover attorney fees, because the contract did not provide for the recovery of attorney fees in this matter. The City appealed the trial court’s judgment, arguing summary judgment was inappropriately granted.

|,o ANALYSIS

In Dinger v. Shea, 96-448, pp. 4-5 (La.App. 3 Cir. 12/11/96), 685 So.2d 485, 488-89, we set forth the standard of appellate review of summary judgments:

Appellate courts review summary judgments de novo under the same criteria that govern the district court’s consideration of whether summary judgment is appropriate. Potter v. First Federal Sav. and Loan Ass’n, 615 So.2d 318 (La.1993). A motion for summary judgment is properly granted only if the pleadings, depositions, answers to interrogatories, and admissions on file, together with the affidavits submitted, if any, show there is no genuine issue of material fact and that the mover is entitled to judgment as a matter of law. La.Code Civ.P. art. 966(B). A fact is “material” if its existence potentially insures or precludes recovery, affects a litigant’s ultimate success, or determines [1079]*1079the outcome of the relevant legal dispute. Cormier v. Wise, 93-1434 (La.App. 3 Cir. 6/1/94), 638 So.2d 688. A fact is “at issue” if there exists any reasonable doubt as to its existence. Durrosseau v. Century 21 Flavin Realty, Inc., 594 So.2d 1036 (La.App. 3 Cir.1992).
[[Image here]]
In the past, any doubt regarding the existence of material facts was to be resolved against granting the summary judgment, even if grave doubts existed as to a party’s ability to establish disputed facts at trial. Penton [v. Clarkson, 93-657 (La.App. 1 Cir. 3/11/94)], 633 So.2d 918. The amendment does not change the law regarding burdens of proof, as the mover is still required to prove the absence of a genuine issue and his entitlement to judgment. Short v. [Gijfin ], 96-0361 (La.App. 4 Cir.8/21/96); 682 So.2d 249; Walker v. Kroop, 96-0618 (La.App. 4 Cir. 7/24/96); 678 So.2d 580. However, it now appears, based on the new language of section (C), that in order to rebut a showing made by the mover of the nonexistence of a genuine issue of material fact, the nonmoving party will be held to a higher standard of proof, i.e., a non-moving party must sufficiently establish the existence of proof of an essential element of his claim on which he is to bear the burden of proving at trial.
See also Townley v. City of Iowa, 97-493 (La.App. 3 Cir. 10/29/97), 702 So.2d 323.

This court in Weill Construction Co. v. Thibodeaux, 491 So.2d 166, 171 (La.App. 3 Cir.1986), discussed what was necessary to attach liability to design professionals, such as architects:

Architects are held liable for damages incurred by the owner by whom they are employed when their plans and specifications are faulty and defective as a result of their neglect in exercising care and skill. In the absence of an express contractual provision to the 14contrary, an architect’s obligation does not guarantee a perfect plan or a satisfactory result. There is no assurance that miscalculations will not occur. Liability is considered to rest only on uns-killfulness or negligence and not upon mere error of judgment. The ordinary care and reasonable skill by virtue of which architects’ preparations of plans and specifications are to be evaluated in determining whether they are guilty of negligence, must be the same care and skill required by others engaged in the same profession in the same locality. Maloney v. Oak Builders, Inc., 224 So.2d 161, 168 (La.App. 4th Cir.1969), modified, 256 La. 85, 235 So.2d 386 (La.1970).

At trial, the party alleging liability on an architect must establish the local prevailing standards for architectural compliance and prove a failure to meet this standard through expert testimony.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Dortch v. Jane Doe & Chrysler Group, LLC
217 So. 3d 449 (Louisiana Court of Appeal, 2017)
Little Capitol of Louisiana, Inc. v. Town of Henderson
128 So. 3d 1019 (Louisiana Court of Appeal, 2013)

Cite This Page — Counsel Stack

Bluebook (online)
95 So. 3d 1076, 11 La.App. 3 Cir. 1200, 2012 La. App. LEXIS 167, 2012 WL 385136, Counsel Stack Legal Research, https://law.counselstack.com/opinion/city-of-alexandria-v-ratcliffe-construction-co-llc-lactapp-2012.