Cincinnati Insurance v. Federal Insurance

166 F. Supp. 2d 1172, 2001 U.S. Dist. LEXIS 16518, 2001 WL 1231809
CourtDistrict Court, E.D. Michigan
DecidedSeptember 27, 2001
Docket00-73415
StatusPublished
Cited by5 cases

This text of 166 F. Supp. 2d 1172 (Cincinnati Insurance v. Federal Insurance) is published on Counsel Stack Legal Research, covering District Court, E.D. Michigan primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Cincinnati Insurance v. Federal Insurance, 166 F. Supp. 2d 1172, 2001 U.S. Dist. LEXIS 16518, 2001 WL 1231809 (E.D. Mich. 2001).

Opinion

*1174 OPINION AND ORDER DENYING PLAINTIFF’S MOTION FOR SUMMARY JUDGMENT AND GRANTING DEFENDANTS’ MOTIONS FOR SUMMARY JUDGMENT

ROBERTS, District Judge.

I. INTRODUCTION

The operative facts of this case are as follows: Defendant Galaxy Machine and Retrofit (“GMR”) purchased a Commercial General Liability Policy from Plaintiff Cincinnati Insurance Company (“CIC”). Defendant Federal Insurance Company (“FIC”) insured Visioneering, Inc. GMR and Visioneering entered into a service contract under which GMR was to perform work at the Visioneering facility. In the process, a motor assembly unit was damaged on Visioneering’s property. Defendant FIC paid Visioneering for damages and lost business income ($642,716.16). Defendant FIC then filed suit in state court against Defendant GMR for reimbursement of the amount it paid to Visio-neering. Defendant GMR requested Plaintiff CIC to defend and indemnify it if it is found liable in that state court action. CIC refused. Instead, it filed this federal court action. CIC seeks a declaratory judgment that it has no responsibility to defend and indemnify GMR, based on certain exclusions in the Commercial General Liability Policy it issued. Before the Court are motions for Summary Judgment filed by all parties.

For the reasons stated below, the Court DENIES Plaintiff CIC’s Motion for Summary Judgment [Doc. # 39] and GRANTS Defendants’ FIC’s and GMR’s [Doc. # 22 and Doc. # 5] Motions for Summary Judgment.

II. BACKGROUND

Visioneering is an engineering company located in Fraser, Michigan which manufactures parts for the automobile and aerospace industries. In 1996, Visioneering purchased a milling machine known as a Cincinnati 5 Axis Profiler. It was manufactured by Cincinnati Machine in 1967. In 1984, it was retrofitted, with the original hydraulic motor drive system being replaced by electric motor drives with electronic controls.

Visioneering contracted with GMR for reassembly and installation of the machine at the Visioneering facility. GMR submitted a proposal to Visioneering on September 11, 1996, which outlined the services to be performed. (See Exhibit A attached to Plaintiffs Motion for Summary Judgment & Exhibit 1 attached to GMR’s Motion for Summary Judgment). Since one of the exclusions (j (4)) in the CIC policy *1175 precludes coverage to GMR if the milling machine was in GMR’s care, custody or control at the time of the accident, each party puts a different spin on the amount and degree of control GMR and/or Visio-neering had over the project.

Notwithstanding, the contract between GMR and Visioneering delineates the duties and responsibilities of Visioneering and GMR. It provides that: (1) all major components will be assembled by GMR, including ball screws, motors, and support bearing, way removal/installation not accounted for; (2) all documentation will be supplied by Visioneering; (3) all parts, electrical, electronic and mechanical, that are required will be supplied by Visioneer-ing; (4) final leveling and squaring will be performed by GMR; (5) and, GMR will not be responsible for OSHA requirements. Further, any prior modifications made or required, in the future, will be the responsibility of Visioneering and/or machine seller; (6) GMR will cover overtime costs to 50 hours per man per week. Additional overtime required by Visioneering will be charged 18.00 per hour; (7) GMR will perform setup and debug of the machine and control; (8) GMR will remain in Visio-neering’s Facility for three days after running to assist with any minor problems; (9) GMR will clean and flush all hydraulic units and way lube systems; (10) GMR will reassemble the tilt axis and accessories, indicating fixtures to be manufactured by Visioneering per GMR specifications; (11) due to the fact that all services will be billed on a time and material basis, GMR technicians will punch in and out at Visio-neering Facility; (12) Visioneering will be responsible for all parts and laser calibration service; (13) GMR will be supplied a minimum of one person to assist in the rebuild; (14) Visioneering agreed to pay one hour of travel time per person per day and mileage expense of .35 per mile for one vehicle; and, (15) services will be billed at GMR’s discounted service rates. Id.

On January 20,1997, near the end of the project, Valent Bachleda, a GMR employee who worked on the project on a daily basis, was preparing to test and power up the motor. In order to do this it was necessary to remove the five separate motors on the machine. Mr. Bachleda had already separated several motors and was separating the motor on the A-axis. He pulled a shaft through that was in the brake assembly, which disabled the brake in that axis, (.Exhibit 2 of GMR’s Motion for Summary Judgment, Bachleda Dep., pp. 11-12). When the brake assembly became disengaged, the motor instantly fell all the way down the axis. Id. At 16-17. The motor struck Mr. Bachleda in the shoulder and caused him to fall where he became trapped. Another much larger motor also fell and crushed his leg. Id. at I7-4-8. The motor had to be removed from Mr. Bachleda’s leg with a crane. Id. At 19-50. An ambulance was called. Mr. Bachleda was rushed to the hospital. Id. At 52-53. Mr. Bachleda suffered severe cuts on his elbow, shoulder, and head, requiring stitches. Id. He broke his right leg in two places, shattered his knee and broke two fingers. Id. He had extensive reconstructive surgery on his knee; pins and screws were installed to hold his leg together. Id.

There was extensive damage to the machine as a result of this accident. GMR offered to repair the damage and complete the project. (See Exhibit 3 of GMR’s Motion for Summary Judgment, Passmore’s Dep. pg. 25). However, Visioneering fired GMR from the project and GMR did not perform any more work. Id. at 25-26. Instead of accepting GMR’s offer, Visio-neering submitted a claim to its insurer, FIC, for $355,486.16 in repair costs, and $294,358.00 for business interruption loss *1176 es, totaling, $642,716.16. GMR employees had no access to the machine after the accident occurred. Id. at 26. FIC paid on Visioneering’s claim. It is this amount that is at issue in the state court action.

CIC asserts here that it has no obligation to defend or indemnify under the CIC policy pursuant to Exclusion j(4) and Exclusion j(6). 1 These exclusions are as follows:

j(4) This insurance does not apply to ... Property damage to pesonal property in the care, custody or control of an insured;
j(6) This insurance does not apply to ... Property damage to that particular part of any property that must be restored, repaired or replaced because “your work” was incorrectly performed on it.

III. STANDARD OF REVIEW

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
166 F. Supp. 2d 1172, 2001 U.S. Dist. LEXIS 16518, 2001 WL 1231809, Counsel Stack Legal Research, https://law.counselstack.com/opinion/cincinnati-insurance-v-federal-insurance-mied-2001.