Christianson v. Pacific Bridge Co.

68 P. 191, 27 Wash. 582, 1902 Wash. LEXIS 427
Washington Supreme Court·Decided March 11, 1902·No. No. 4091·Published·Cited by 21 cases

Opinion

The opinion of the court was delivered by

Hadley, J.

On the 16th day of April, 1900, the appellant, a corporation, was engaged in constructing a pipe line from Cedar Lake, in King county, Washington, into the city of Seattle; the same-being part of what is known as the “Cedar River Water System.” The respondent was in the employ of appellant as a laborer. A large ditch had been dug, along and through which said pipe line was being laid. The evidence is not harmonious as to the depth of the ditch. The testimony of some of the witnesses as to the depth placed it from seven to eight feet, and that of others from eleven to twelve feet. The ditch was of sufficient width at the bottom to 'admit a pipe about four feet in thickness, and still leave a small space along either side, —perhaps two feet. The pipe was also;, four feet high. The ditch was wider at the top than at the bottom, the sides being made with a slope toward the bottom. At a point near Thirteenth and Massachusetts streets in the city of Seattle the pipe had been placed in its proper position in the ditch, but had not yet been covered with earth. Respondent and another were engaged in shoveling loose dirt which had been thrown out of the ditch to the' side of the pipe. The dirt so thrown in was being tamped or packed by another workman at the lower sides of the pipe so as to hold it more securely in its place until the heavier work of filling- the entire ditch should be done. The upper portion of the sides of the ditch consisted of a hard, gravelly formation resembling cement or concrete, but near the bottom the formation was sandy. Respondent and other witnesses testify that while he was engaged in shoveling the earth as aforesaid the foreman of appellant in [584] charge of the work at that place came along and. said to the respondent, in effect, that the process of shoveling dirt from above for tamping purposes was too slow, and directed respondent to get down into the ditch, and by the use of a pick to dig out the soft earth from the side of the ditch at the bottom; adding that, in that manner one man could do as much work as two could do as they were then working. It was further testified that respondent immediately complied with the direction of the foreman, and got down into the ditch and began digging with his pick from the hard, gravelly formation at the top of the ditch, endeavoring to loosen it and drag it into the ditch; hut that the foreman informed him he did not intend for him to dig from the top, and then went down into the ditch himself, took the pick from the hands of respondent, began digging the soft sand from the side of the ditch at or near the bottom, by way of showing respondent how he desired it done, and then handed the pick back to respondent, with the direction that he should dig as he had been shown; remarking at the time that the soft earth at the bottom was much better for tamping purposes than the harder formation respondent had endeavored to dig from the top. It was further testified that the foreman then went away to look after some other part of the work, and that, respondent continued to dig as he had been directed; and respondent himself testified, that, before leaving, the foreman assured him that the top was solid and would not cave in. Respondent continued to dig at the place-for ten 0.1 fifteen minutes, when a mass of earth broke away from the side wall of the ditch and fell upon him, throwing him back against the pipe and rendering him entirely helpless. The earth was removed from about him by his fellow workmen, and he was taken out in an unconscious condition; having received injuries about the back and hip, and probably others. [585] This suit was brought for the purpose of recovering damages from appellant on account of said injtiries. The cause was tried before a jury, and a verdict returned in favor of respondent in the sum of $1,950. Appellant moved for a new trial, which was denied, and thereupon judgment was entered upon the verdict of the jury for the full amount thereof. From said judgment this appeal was taken.

Free access — add to your briefcase to read the full text and ask questions with AI

Christianson v. Pacific Bridge Co., 68 P. 191, 27 Wash. 582, 1902 Wash. LEXIS 427 (Wash. 1902).

68 P. 191 (Christianson v. Pacific Bridge Co.) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Ethan Boudreaux v. Weyerhaeuser Company
Court of Appeals of Washington, 2019
Richardson v. Pacific Power & Light Co.
118 P.2d 985 (Washington Supreme Court, 1941)
Bender v. White
92 P.2d 268 (Washington Supreme Court, 1939)
Crumrine v. Grubb
5 P.2d 498 (Washington Supreme Court, 1931)
Benson v. English Lumber Co.
129 P. 403 (Washington Supreme Court, 1913)
Meigs v. Porter
126 P. 411 (Washington Supreme Court, 1912)
Richmond v. Tacoma Railway & Power Co.
122 P. 351 (Washington Supreme Court, 1912)
Beseloff v. Strandberg
113 P. 250 (Washington Supreme Court, 1911)
Cox v. Wilkeson Coal & Coke Co.
112 P. 231 (Washington Supreme Court, 1910)
Anustasakas v. International Contract Co.
98 P. 93 (Washington Supreme Court, 1908)
Millen v. Pacific Bridge Co.
95 P. 196 (Oregon Supreme Court, 1908)
Withiam v. Tenino Stone Quarries
92 P. 900 (Washington Supreme Court, 1907)
Pearson v. Federal Mining & Smelting Co.
84 P. 632 (Washington Supreme Court, 1906)
Hansen v. Seattle Lumber Co.
83 P. 102 (Washington Supreme Court, 1906)
Hart v. Cascade Timber Co.
81 P. 738 (Washington Supreme Court, 1905)
Bier v. Hosford
77 P. 867 (Washington Supreme Court, 1904)
Jancko v. West Coast Manufacturing & Investment Co.
76 P. 78 (Washington Supreme Court, 1904)
Benson v. Town of Hamilton
75 P. 805 (Washington Supreme Court, 1904)
Morton v. Moran Bros.
70 P. 968 (Washington Supreme Court, 1902)