Chicago & Northwestern Railway Co. v. Board of Supervisors

171 Iowa 741
Supreme Court of Iowa·Decided June 18, 1915·Published·Cited by 6 cases

Opinion

Weaver, J.

— Some two miles of the plaintiff’s right of way are included within the limits of Drainage District No. 114, in Hamilton county. The total cost of the drainage system was about $91,000, and in assessing the same upon the property of the district, • the commissioners estimated the amount chargeable to the railway company at $1,500. The estimate was approved by the board of supervisors and a levy made accordingly. The company appealed to the district court where, after hearing the evidence, it was ordered that the assessment be reduced to $800, and from this ruling and judgment the defendant has appealed to this court.

It is argued for the appellee that the railway is in no manner benefited by the drainage and ought not to be subjected to any tax therefor; or, if it be chargeable with any part of the cost thereof, then the assessment of $1,500 is excessive and out of proportion to the benefits.

[743] „ „ „ way •riSneflte eyidence. [742] I. The trial court evidently found against the plaintiff’s proposition that it was not benefited in any material degree [743] by the improvement, but sustained its further contention that the assessment is excessive. It is true that • ^e eorQPany put upon the stand different engineers in its employment, some of whom seem to go to the extent of saying that the drainage of ponds and surface water from the right of way is of no benefit or advantage whatever to the railway company or its property, a statement so radical and so contrary to the teaching of human observation and experience in general that the court was justified in refusing to be guided thereby. It appears from the proof that the two miles of railway in question is laid through the' usual succession of slight elevations with intervening ponds, sloughs and wet or marsh lands which are common in that part of central Iowa. The map or plat prepared by the company’s engineers indicates that, prior to the drainage, about one'third of the right of way within the district ran through water and wet, low or marshy ground, one of the stretches of 800 feet being marked as water from 1 to 2 feet deep. For the passage of water under its tracks, the company was maintaining five bridges, two of them being of iron pipe 24 and 36 inches in diameter, and two trestles of one span each, and one trestle of two spans. The main line of the drainage ditch, laid with a 24-ineh tile, approaches, the right of way from the south near the west end of the district and crosses the right of way through the large pond of which we have spoken, then swinging around a somewhat extended curve to the east and south, it continues east near the line of the right of way, which it crosses again to the south through low and marshy ground about 2,200 feet east of the first crossing. The tile is there enlarged to 30 inches and continues to the southeast. Five thousand feet east of the point where we have noted the last crossing of the right of way by the main ditch, it is crossed by a lateral laid with 18-inch tile through a pond, and again, 1,100 feet still farther east, it is crossed by another lateral laid with 14-inch tile through water. The two laterals are brought together about 1,100 [744] feet south, of the right of way, and thence run south toward the main ditch. This survey was made while the ditch was in course of construction and the tile was in operation, to some extent. The engineer says the tile drains seemed to be sufficient to take care of the water, and that upon a more recent visit to the place, he did not observe any water op the right of way. It also appears that, since the ditching was done, the company has taken out the three trestles mentioned and substituted permanent embankments with concrete pipe openings, two of 24-inch and one of 36-ineh diameter.

Without going further at this point, it is enough to say that from plaintiff’s own showing it must have received very substantial benefits from the drainage afforded by this improvement, and should contribute in fair proportion to its cost.

II. The question left for us to consider is whether the trial court erred in finding the assessment excessive and reducing the amount from $1,500 to $800.

Free access — add to your briefcase to read the full text and ask questions with AI

Chicago & Northwestern Railway Co. v. Board of Supervisors, 171 Iowa 741 (iowa 1915).

171 Iowa 741 (Chicago & Northwestern Railway Co. v. Board of Supervisors) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

In re Chicago, R. I. & P. Ry. Co.
28 F.2d 56 (D. Kansas, 1928)
City of Alcoa v. Louisville & N. R.
274 S.W. 1110 (Tennessee Supreme Court, 1925)
Chicago & Northwestern Railway Co. v. Board of Supervisors
182 Iowa 60 (Supreme Court of Iowa, 1916)