Chiasson v. Brand Energy Solutions L L C

District Court, W.D. Louisiana·Decided April 6, 2020·No. 6:16-cv-00968·Unknown

Opinion

UNITED STATES DISTRICT COURT WESTERN DISTRICT OF LOUISIANA LAFAYETTE DIVISION

BLAINE CHIASSON CASE NO. 6:16-CV-00968

VERSUS JUDGE ROBERT R. SUMMERHAYS

BRAND ENERGY SOLUTIONS, LLC, MAGISTRATE JUDGE HANNA ET AL.

MEMORANDUM RULING Before the Court are two Motions for Summary Judgment filed by Defendants BP Exploration & Production, Inc. (“BP”) [ECF No. 120] and Ecoserv, LLC (“Ecoserv”) [ECF No. 133]. Pursuant to their motions, Defendants seek dismissal of all claims brought against them by Plaintiff Blaine Chiasson. For the following reasons, the motions are GRANTED and all claims against BP and Ecoserv are DISMISSED WITH PREJUDICE. I. BACKGROUND

Plaintiff brings this suit in admiralty for personal injuries allegedly incurred due to a slip and fall on March 22, 2016, while working onboard the WEST CAPRICORN, a semi-submersible drilling rig located off the coast of Louisiana and owned by Defendant Seadrill Americas, Inc. (“Seadrill”). [ECF No. 63 at 3-4, ¶¶ 7, 9]. At the time of the incident Plaintiff was employed by Brand Energy Solutions, LLC (“Brand Energy”).1 Id. In March of 2016, Seadrill contracted with Defendant M&M Industrial Services, Inc. (“M&M) to provide scaffold builders to facilitate maintenance work on the WEST CAPRICORN’s mud tanks. [ECF No. 122-1 at 1, ¶ 3]. M&M in turn contracted with Brand Energy to erect the scaffolding in the mud tanks. Id. On Plaintiff’s

1 Brand Energy and its Insurer have intervened in this suit to recover from Defendants amounts paid (and amounts to be paid) to Plaintiff in longshore benefits. [ECF No. 106]. second day of work, he slipped in drilling mud while working in Reserve Mud Tank No. 5, resulting in injuries to his knee, hip and back. Id. at ¶¶ 4, 8. Prior to Plaintiff’s accident, BP had time chartered the WEST CAPRICORN from Seadrill for drilling operations. Id. at ¶ 20]. Approximately two months prior to Plaintiff’s accident, BP’s

charter was ending and it was preparing the vessel for return to Seadrill. [ECF No. 120-7 at 4]. Accordingly, BP’s drilling fluid engineer, M-I SWACO (“M-I”), pumped its drilling mud off the vessel.2 BP then retained Ecoserv to clean the WEST CAPRICORN’s mud system, which included the vessel’s eight mud tanks. [ECF No. 143-1 at 1, ¶ 3]. After Ecoserv cleaned a tank, the Ecoserv supervisor would contact the M-I mud engineer who would inspect the tank. Id. at ¶ 4. Once the Ecoserv supervisor and the M-I engineer were satisfied a tank was clean and dry, the Seadrill derrickman would inspect the tank. Id. at ¶¶ 8, 16; see also ECF No. 111-6 at 2. If satisfied the tank was clean and dry, the derrickman would place the hatch cover back on top of the tank to seal it. [ECF No. 143-1 at 1-2, ¶¶ 15-16]. As to Reserve Mud Tank No. 5 specifically, the Ecoserv supervisor testified that Ecoserv cleaned the tank from January 31 to February 1, 2016. [ECF No.

111-4 at 12]. When he was satisfied the tank was clean and dry, he contacted the M-I mud engineer. Id. at 16. The M-I mud engineer inspected Tank No. 5 on February 3, 2016 and found the tank clean and dry. [ECF No. 111-5 at 3-6; see also ECF No. 111-10]. After Seadrill confirmed the tank was clean, it was sealed by closing the hatch. [ECF No. 133-3 at 10]. On February 8, 2016, Ecoserv finished the cleaning process and left the ship, along with the M-I mud engineer. [ECF No. 122-1 at 3, ¶ 50]. After Ecoserv and M-I left the vessel, BP conducted no further drilling operations on the WEST CAPRICORN. Id. at ¶ 61; see also ECF No. 111-6 at 6-8.

2 The Court previously granted M-I’s motion for summary judgment and dismissed it from this suit. [ECF No. 142]. After BP’s operations ended, Seadrill began preparations for stacking the vessel. [ECF No. 122-1 at 4, ¶ 63]. On February 15, 2016, Seadrill performed another inspection of all tanks on the ship, as it planned to conduct maintenance work on some of the tanks while the vessel was stacked. [ECF No. 120-16 at 10, ¶¶ 63-64]. During this inspection, the ship’s logs indicate Seadrill found

drilling mud in Reserve Mud Tank No. 7. Id.; see also ECF No. 116 at 2. Accordingly, Seadrill ordered that all tanks be reopened to reinspect for drilling mud. [ECF No. 116-2 at 25]. Seadrill’s Offshore Installation Manager (“OIM”) testified that from a review of the daily drilling reports, it appears that all other tanks were found to be clean. [ECF No. 120-7 at 27-28]. The OIM additionally testified that the WEST CAPRICORN’s plumbing system includes isolation valves that are used to prevent liquids from entering a tank. [ECF No. 116-5 at 3-4]. The valves for the pipes are located outside of the tanks, they are locked, and only Seadrill personnel have access to the valves. Id. at 5, 13. During the cleaning process, the valves are shut off. Id. at 3. The OIM testified that once a tank was clean, dry and sealed, the only way for mud to re-enter the tank was if Seadrill personnel opened a valve. Id.

On March 21, 2016, Plaintiff arrived on the vessel to begin erecting scaffolding in the tanks to facilitate Seadrill’s maintenance work. Plaintiff testified it was common to be on alert for slipping hazards when working in mud tanks, and he testified drilling mud was present in the tank in which he worked the first day. [ECF No. 111-8 at 1; ECF No. 116-1 at 2, ¶ 22]. Accordingly, Plaintiff requested and received rubber boots from Seadrill. [ECF No. 111-8 at 22; ECF No. 120- 3 at 12]. On Plaintiff’s second day of work, he was advised during a Job Safety Analysis meeting that the tanks were slippery. [ECF No. 111-8 at 1-2, 20-21; see also ECF No. 111-11 at 2]. Plaintiff testified that he worked in Tank No. 5 for approximately nine hours that day and climbed into and out of Tank No. 5 approximately six times without incident. [ECF No. 111-8 at 8-9, 21]. However, on his last trip into the tank, Plaintiff stepped onto the deck of the tank, turned and took a step towards the tank’s fixed ladder, and as he stepped his foot slipped in drilling mud resulting in his injuries. [ECF No. 111-8 at 16-18]. Plaintiff contends BP and Ecoserv are liable for his injuries due to their alleged failure to remove all drilling mud from Reserve Mud Tank No. 5 in February

2016. BP and Ecoserv now seek dismissal of Plaintiff’s claims. II. APPLICABLE LAW A. Summary Judgment Standard “A party may move for summary judgment, identifying each claim or defense–or the part of each claim or defense–on which summary judgment is sought.” Fed. R. Civ. P. 56(a). “The court shall grant summary judgment if the movant shows that there is no genuine dispute as to any material fact and the movant is entitled to judgment as a matter of law.” Id. “A genuine issue of material fact exists when the evidence is such that a reasonable jury could return a verdict for the non-moving party.” Quality Infusion Care, Inc. v. Health Care Service Corp., 628 F.3d 725, 728 (5th Cir. 2010). As summarized by the Fifth Circuit: When seeking summary judgment, the movant bears the initial responsibility of demonstrating the absence of an issue of material fact with respect to those issues on which the movant bears the burden of proof at trial. However, where the nonmovant bears the burden of proof at trial, the movant may merely point to an absence of evidence, thus shifting to the non-movant the burden of demonstrating by competent summary judgment proof that there is an issue of material fact warranting trial.

Lindsey v. Sears Roebuck and Co., 16 F.3d 616, 618 (5th Cir.1994) (internal citations omitted).

Free access — add to your briefcase to read the full text and ask questions with AI

Chiasson v. Brand Energy Solutions L L C, (W.D. La. 2020).

Chiasson v. Brand Energy Solutions L L C (Chiasson v. Brand Energy Solutions L L C) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Florida Fuels, Inc. v. Citgo Petroleum Corp.
6 F.3d 330 (Fifth Circuit, 1993)
Lindsey v. Sears Roebuck and Co.
16 F.3d 616 (Fifth Circuit, 1994)
Little v. Liquid Air Corp.
37 F.3d 1069 (Fifth Circuit, 1994)
Roberts v. Cardinal Services, Inc.
266 F.3d 368 (Fifth Circuit, 2001)
Kermarec v. Compagnie Generale Transatlantique
358 U.S. 625 (Supreme Court, 1959)
Anthony Chavez v. Noble Drilling Corporation
567 F.2d 287 (Fifth Circuit, 1978)
Daniel F. Daigle v. Point Landing, Inc.
616 F.2d 825 (Fifth Circuit, 1980)
Consolidated Aluminum Corp. v. C.F. Bean Corp.
833 F.2d 65 (Fifth Circuit, 1988)
Landry v. Huthnance Drilling Co.
889 F.2d 1469 (Fifth Circuit, 1989)