Carr v. Piscataquis Woolen Co.

85 A. 497, 110 Me. 184, 1912 Me. LEXIS 26
CourtSupreme Judicial Court of Maine
DecidedDecember 29, 1912
StatusPublished
Cited by1 cases

This text of 85 A. 497 (Carr v. Piscataquis Woolen Co.) is published on Counsel Stack Legal Research, covering Supreme Judicial Court of Maine primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Carr v. Piscataquis Woolen Co., 85 A. 497, 110 Me. 184, 1912 Me. LEXIS 26 (Me. 1912).

Opinion

Hanson, J.

This is a complaint for flowage inserted in a writ of attachment, and comes before the court on report.

The plaintiff is the owner of several lots of 'land in the town of Abbott in Piscataquis County, bounded by the Piscataquis river, or near said river and its tributaries.

The defendants are owners of woolen mills in the town of Guilford. The complaint alleges: “That the said Piscataquis Woolen Company, a. long time ago, to wit; A. D. 1881, erected and have ever since maintained a water mill, to wit, a woolen mill or factory, so called, at Guilford village, in said county, on the north side of said Piscataquis river, and upon its land; and the said M. H. Hussey Woolen Company, a long time ago, h> wit; A. D. 1906, erected upon its land and has since maintained' a water mill, to wit, a woolen mill or factory, so called, at Guilford village aforesaid, on the south side of said river, which said river is not navigable; and the said defendants in a certain year, to wit, A. D. 1909, erected a mill-dam and have maintained the same to the date of this complaint, upon and across said river at said Guilford village, to raise water for working said mills and still maintain the same to- .this date and still maintain said mills; said dam extending from and upon land of the said Piscataquis Woolen Company on the north side of said river across to and upon land of the said Hussey Woolen Company on the south side of said river; and said dam was erected and maintained and is still maintained by said defendants for the purpose of raising the water in said river to work and operate said mills:

“That by means of said dam the said defendants have 'Caused the water in said river to overflow and drown, damage, injure and destroy from the date aforesaid, to wit, the year of our Lord 1909 to the present time the complainant’s land aforesaid, whereby said land has been rendered useless, and your complainant has sustained great damage in his land by reason of said flowage by said mill-[187]*187dam, yearly, since the erection and during the maintenance of said dam as aforesaid, in a large sum of money, to wit, the sum of one thousand dollars.”

The defendants plead the general issue, and by brief statement say: First, that they have a right to maintain the dam set out in the complaint of said plaintiff and flow the lands of said plaintiff without any compensation.

Second, that said dam has been maintained at its present height for more than fifty years, and that said defendants have acquired the right by prescription to have and maintain said dam at its present height.

Third, that when the concrete dam which now exists across said river was built in the summer of 1909, it was not built to any greater height than the wooden dam which was taken down at the time said concrete dam was built.

The land described in this complaint is located about one and one-half miles above defendant’s dam. . The first dam in the river at this point was built in 1823; was replaced in 1864 by a new dam similar to the first; this was re-built in 1881 and continued in use until 1903 when it was repaired by one Trafton. In 1906 it was again repaired, and in 1909 it became necessary to make more extensive repairs on the dam and the work had progressed to some extent when the owners concluded to build a new dam of concrete, which was done in that year. That the defendants had the right to construct a new concrete dam a few feet below the old dam is not questioned.

The plaintiff claims that the new dam has been raised above the level existing before 1903, when repairs were made by Trafton, making a radical change in the actual height of the dam, and necessarily a change in its effective height, and that the damage complained of followed the repairs of 1903 to some extent, but became greater after the year 1909, when the new concrete dam was built to supply the place arid purposes of the old dam..

After the plaintiff introduced the testimony of civil engineers, and his own testimony as to the location of the dam, the property claimed to be flowed, the course of the river and distance' of the land flowed above the dam, the presiding Justice ruled that the [188]*188defendant’s plea admitted the flowage as claimed by -the plaintiff; that plaintiff had made out a prima facie case, and that under the pleadings the ¡burden of proceeding changed.

The defendants thereupon introduced evidence tending to show:

1, That since 1864 the actual height of the various dams, when in good repair, has been the same.

2, That since 1881 a mark in the granite wall of the Piscataquis Woolen Mill which then showed the upper side of the top log of the old dam, has been ‘used as a guide in all repairs since made and was especially used in determining the height of .the new concrete-dam which was built in 1909, and that it was built no higher than the dam which it replaced, allowance being made for the planking which projected' above the top log about four inches.

3, That the new dam did not, and does not, flow any more land than the dams of 1864, 1881, 1903, and 1906 flowed when in repair and in good order.

4, That any additional flowage occurring in ‘April or May, 1911, as claimed by plaintiff, was due to an unusual freshet at the time, and also due to the presence of a large boom of logs in the river at a point one-half mile above their dam, belonging ,to the Piscataquis Lumber Company, and over which the defendants had no control.

The testimony on both sides was directed mainly to the actual height of the various dams, and the extent of the flowage at different periods. The plaintiff insists that the case should proceed and be governed by the points shown, upon a plan, to have been reached by the water on April 29, 1911, — as conclusive that a larger area was flowed on that date than ever before.

In answer to this contention the defendants claim that on April 29, 1911, there was an unusually high run of -water, due to the spring freshet, and the case shows that on that day the level of the river was thirty-two inches above the dam, a point so high, defendants claim, that no act of theirs could influence the flow, and while at such stage their mills could not be used.

The defendants introduced the testimony of one Elmer Crowley, a civil engineer, who had made a survey of the river in January, 1911, and again on May 15, 1911, after the freshet had subsided and defendants’ mills were in operation. On May 15, 1911, he [189]*189found a boom of logs in the river at a steam saw-mill located one-half mile above the concrete dam, and while there ascertained the level of the water below and above the logs, and found the elevation of the water above the logs to be five inches higher than below the logs “and .the water was at the top of the dam but not running over.”

This testimony is uncontradicted and corroborates the theory of the defendants that the increase in the height of the water in the river above the logs on April 29th and May 15th was not due to the height of the dam, or the fault of the defendants.

It is admitted “that the defendants in 1903 had acquired a prescriptive right to flow the plaintiff’s land to the extent that it would be flowed by the water held back by the dam at its effective height, as said dam existed in that year prior to any repairs, changes or additions made in said year.”

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Robinson v. Saul
D. Alaska, 2020

Cite This Page — Counsel Stack

Bluebook (online)
85 A. 497, 110 Me. 184, 1912 Me. LEXIS 26, Counsel Stack Legal Research, https://law.counselstack.com/opinion/carr-v-piscataquis-woolen-co-me-1912.