Calmaquip Engineering West Hemisphere Corp. v. West Coast Carriers Ltd.

650 F.2d 633, 1984 A.M.C. 839
CourtCourt of Appeals for the Fifth Circuit
DecidedJuly 13, 1981
DocketNos. 79-2926, 79-3248
StatusPublished
Cited by18 cases

This text of 650 F.2d 633 (Calmaquip Engineering West Hemisphere Corp. v. West Coast Carriers Ltd.) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fifth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Calmaquip Engineering West Hemisphere Corp. v. West Coast Carriers Ltd., 650 F.2d 633, 1984 A.M.C. 839 (5th Cir. 1981).

Opinion

THOMAS A. CLARK, Circuit Judge:

This is a consolidated appeal from the grant of summary judgment in favor of [635]*635plaintiff below, Calmaquip Engineering West Hemisphere Corp. (the “shipper”), in an admiralty action for cargo damage brought under the Carriage of Goods by Sea Act (COGSA), 46 U.S.C. § 1300 et seq. Appellant, West Coast Carriers Ltd. (the “carrier”), objects to the $40,917.07 awarded to Calmaquip for cargo damage sustained during carriage from the port of Miami to the Panamanian port of Las Minas and the inland destination of Tocumen. We affirm.

In January, 1977, West Coast Carriers agreed to transport seven airport loading bridges, disassembled into fifty parts, pursuant to a bill of lading that directed delivery to a new international airport at Tocumen, Panama.1 Calmaquip delivered the cargo to the carrier’s stevedore at Dodge Island, Florida, between February 8 and February 15, 1977, specifically directing the carrier’s agent to ship the cargo below deck. The bill of lading also specified below deck storage.

The bridges had been prepared for shipment by the manufacturer, Wollard Aircraft, and sprayed with an oil base coating designed to protect against salt air and salt water damage. The open sections of the bridges were capped with plywood and caulked, and lifting eyes had been attached to the plywood caps in order to facilitate unloading. The airport loading tunnels had been cut into forty-foot modules in order to fit inside the ship’s hold. The carrier received the cargo without exception and issued dock receipts for fifty pieces of cargo.

During carriage the carrier stored the bridges both above and below deck, and when the cargo was discharged at Las Minas on February 21, 1977, exceptions were noted by a person not identified by the parties, indicating that the cargo had been damaged.2 On March 24, 1977, the cargo arrived at its inland destination of Tocumen. In addition to the carriage charges between Florida and Las Minas, the shipper paid West Coast Carriers $10,000 for the inland carriage. At Tocumen, engineer Antonio Oyarzun, project manager for the installation of the bridges, examined the cargo and determined that forty-three of the fifty pieces were damaged. He calculated that their repair would cost $40,917.07.

I.

Before turning to the merits of this appeal, it must be noted that this court technically has two consolidated cases before it on appeal. However, the two appeals are both taken from the same single district court case. Below, the district court granted summary judgment for the plaintiff-shipper on July 6, 1979. Summary judgment was entered in an order labeled “Order Granting Motion for Summary Judgment.” For reasons that are not entirely clear from the record, the district court did not enter a separate judgment as required by Rule 58 of the Federal Rules of Civil Procedure until August 27, 1979.3 However, before the final judgment was entered, the appellant, on August 3, 1979, noticed an appeal from the July 6 order that had granted summary judgment for the plaintiff-appellee. That “appeal” was docketed in this court as appeal No. 79-2926.

After the district court complied with Rule 58, the appellant, on September 14, 1979, filed a second notice of appeal which was docketed in this court as appeal No. 79-3248. The appellee, Calmaquip Engineering, has moved to dismiss the appellant’s first appeal in this case, No. 79-2926. We agree that the first appeal must be dismissed.

This court has held previously that a ruling which grants a motion for summary judgment by itself is not an appealable order. Nunez v. Superior Oil Co., 535 F.2d 324 (5th Cir. 1976). There must also be strict mechanical compliance with the re[636]*636quirement of Rule 58 that the judgment be set forth on a separate document. United States v. Indrelunas, 411 U.S. 216, 93 S.Ct. 1562, 36 L.Ed.2d 202 (1973); Taylor v. Sterrett, 527 F.2d 856 (5th Cir. 1976); State National Bank of El Paso v. United States, 488 F.2d 890 (5th Cir. 1974). Here, at the time of the appellant’s first notice of appeal, the district court had not yet entered its “Final Summary Judgment,” the separate document required under Rule 58. Therefore, the appellant’s appeal No. 79-2926 was premature and is hereby dismissed.

The premature first appeal did not, as the appellant suggests, divest the district court of its jurisdiction to enter the final judgment. As this court has held, “[t]he requirements of Rule 58 may be satisfied by the district court after an appeal is docketed.” Kirtland v. J. Ray McDermott & Co., 568 F.2d 1166, 1169 (5th Cir. 1980).

We emphasize, however, that by dismissing the appeal in No. 79-2926 the appellant suffers no prejudice as both appeals were taken from the same summary judgment order. Apparently, once the appellant realized that its first notice of appeal might be premature, it wisely chose to perfect another appeal after the entry of final judgment, heeding this court’s advice in Markham v. Holt, 369 F.2d 940, 943 (5th Cir. 1966). The notice of the second appeal was filed within the appropriate time period after the final judgment was entered. We now turn to a consideration of the merits of that appeal.

II.

On appeal from the award of summary judgment in favor of the shipper, our inquiry must focus on whether the trial court erred in concluding that there were no contested issues of material fact. We find no error. Pursuant to local rule, plaintiff below filed a statement of material facts in support of its motion for summary judgment. Local Rule 10(J)(2) states:

Motions for summary judgment shall be accompanied by a memorandum of law, necessary affidavits, stamped addressed envelopes for notice, and a concise statement of the material facts as to which the moving party contends there is no genuine issue to be tried. The papers opposing a motion for summary judgment shall include a memorandum of law, necessary affidavits, and a concise statement of the material facts as to which it is contended that there exists a genuine issue to be tried. All material facts set forth in, the statement required to be served by the moving party will be deemed admitted unless controverted by the opposing party’s statement [emphasis added].

The plaintiff submitted a list consisting of ten material facts. The carrier contested only fact number four regarding the clarity of directions specifying below deck storage. Furthermore, the defendant submitted no alternative statement of facts.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Goldic Electrical Inc. v. Loto Corp.
27 F. App'x 71 (Second Circuit, 2001)
Tubacex, Inc. v. M/V Risan
45 F.3d 951 (Fifth Circuit, 1995)
The Rapp Business Corporation v. Leroy Eslinger
833 F.2d 1013 (Sixth Circuit, 1987)
Ingersoll Milling MacHine Co. v. M/V Bodena
619 F. Supp. 493 (S.D. New York, 1985)
United States v. Arturo Perez
736 F.2d 236 (Fifth Circuit, 1984)

Cite This Page — Counsel Stack

Bluebook (online)
650 F.2d 633, 1984 A.M.C. 839, Counsel Stack Legal Research, https://law.counselstack.com/opinion/calmaquip-engineering-west-hemisphere-corp-v-west-coast-carriers-ltd-ca5-1981.