Cahalan Investment Co. v. Yakima Central Heating Co.

193 P. 210, 113 Wash. 70, 1920 Wash. LEXIS 799
CourtWashington Supreme Court
DecidedNovember 1, 1920
DocketNo. 15669
StatusPublished
Cited by13 cases

This text of 193 P. 210 (Cahalan Investment Co. v. Yakima Central Heating Co.) is published on Counsel Stack Legal Research, covering Washington Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Cahalan Investment Co. v. Yakima Central Heating Co., 193 P. 210, 113 Wash. 70, 1920 Wash. LEXIS 799 (Wash. 1920).

Opinion

Fullerton, J.

This is an appeal from a decree of the superior court of Yakima county, awarding to the respondent, Cahalan Investment Company, a mandatory injunction, requiring the appellant, Yakima Central Heating Company, to furnish steam heat for an apartment building owned by the respondent, in accordance with the conditions of a contract which the court found had been entered into between the parties. The facts appearing from the record are, in substance these:

In the year 1917, the appellant was, and for a number of years prior thereto had been, engaged in the 'business of furnishing steam heat to buildings in the business district of the city of Yakima. It owned a steam heating plant, consisting of boilers and other equipment, and owned the conduits leading from the plant to the places of use, but did not itself generate the steam heat it used. This was generated by another corporation under a contract at certain fixed rates, which contract, at the time named, had a number of years to run. The respondent was then contemplating the erection of an apartment building in the city of Yakima. Learning of this, the appellant made it a proposition to furnish the building with steam heat. The proposition was in the form of a letter; the parts thereof material to the present controversy being as follows:

“Referring to the matter of service for your proposed apartment building to be located at 4th St. & Yakima Ave., North Yakima, Washington.
“We propose to supply steam for the heating of said building and for heating water for an eight-month season at $1,500 per season, on a five-year contract, providing that the system shall be installed according to the plans and specifications drawn by us; same to be so designed that it may be converted into a private [72]*72plant at the end of the five year period, if desired. The eight-month season mentioned shall be from September 15th to May 15th.
“These figures are based upon your installing your water system with a pre-heater in such a manner that all condensation from the radiators will pass through it. The tank containing the hot water'to be equipped with an Ideal Syphon Tank Begulator, or other type of tank regulator approved by us. Said regulator to be connected to the steam main to increase the temperature of the water. This tank is to be properly lagged.
“The figures given are based upon 4,400 feet of radiation installed in the building. If the amount of radiation is greater or less than this amount our figures will be changed by adding or decreasing 30c per foot per season.”

There was no acceptance in writing of the proposition; nor was there any written contract entered into between the parties. embodying its terms. The respondent, however, proceeded with the construction of the building. It employed a Mr. Bradley to furnish and install the steam pipes and radiators necessary to heat the building, and directed him to consult with the appellant as to the plans and specifications for the heating appliances required. Following these instructions, Mr. Bradley collaborated with the representatives of the appellant, and they together determined upon the necessary installation, drawing outline plans therefor. No formal specifications were drawn, although, seemingly, certain matters which might have been proper in specifications were delineated on the plans. The heating appliances were installed as the building progressed; and during the course of the work it was inspected from time to time by the appellant’s representatives. The recommendations of these, reprer .sentatives were not followed implicitly, however, by Mr. Bradley. In certain places piping of a larger size, and in certain others piping of a smaller size, than that [73]*73recommended was installed. The plant as installed was so designed as to be readily converted into a private heating plant, and all of the witnesses agree that there was nothing special or unusual in its design, but that it was such a plant as is usually installed in buildings of like character.

After the installation of the plant, the appellant connected its mains therewith and furnished the necessary steam for heat until the close of the heating season of 1918, charging therefor at the rate named in its written proposal. At that time it notified the respondent that it would not continue furnishing heat for the building, except at an increased rate — the current rate paid by other consumers of its product. The respondent thereupon instituted the present action, with the result we have before indicated.

There is a dispute in the evidence on the question whether there was a formal acceptance of the proposal. The manager of the heating plant testified that he verbally accepted the order on his company’s behalf in April, 1917. On the other hand, the appellant’s representative testified that there was no acceptance of the offer whatsoever. That, on the contrary, sometime late in the summer of 1917, he notified the respondent’s manager that his company would be unable to furnish heat in conformity with the proposal for the period specified; that it would do so as long as it could obtain steam from the corporation which was then supplying it at the rate of its existing contract, but if the rates were raised to it, it would be compelled to raise the rates to its consumers correspondingly, and that the respondent assented to this new proposal. He testified further that the flat rate offered was based upon the company’s meter rates and was substantially the then prevailing rate charged its consumers generally. There [74]*74was further evidence to the effect that the company generating the steam for the appellant later refused to continue in the performance of its contract and refused to generate heat unless there was a readjustment of rates — the reason given being that war conditions' had so increased the cost of production that it could not proceed further without bankruptcy.

■ It is our opinion that the record is insufficient to warrant a decree of specific performance. First; it is a general rule that a decree for the specific performance of a contract will not be granted unless, the evidence of the making of the contract' is clear and convincing (25 R. C. L. 337, § 160; Wilbur v. Toothaker, 105 Me. 490, 75 Atl. 42), and we are not persuaded that the evidence here satisfies the rule. But we think we should refrain from a discussion of the evidence or from expressing the deductions and conclusions we draw therefrom. The conclusion we have reached in the case as a whole leaves open to the respondent the right to maintain an action at law as for a breach of the contract, and any discussion' of the evidence on our part'could well prejudice one or the other of the parties in the .trial of such an action. It' may be well to say, however, that a distinction exists in the degree' of proof required to. establish a contract when the action is one to recover in damages for a breach of the contract and when it is one to enforce a specific performance of the contract. In-the one case the plaintiff may recover if he shows the existence of the contract by a preponderance, of the evidence (provided, of' course,'his evidence makes a prima facie case), while in the other he must satisfy the court of the existence of the contract by clear and convincing evidence.

Second; a court of equity is always loath to specifically enforce a contract the enforcement of which-[75]

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Carpenter v. Folkerts
627 P.2d 559 (Court of Appeals of Washington, 1981)
Powers v. Hastings
612 P.2d 371 (Washington Supreme Court, 1980)
Hallauer v. Certain
575 P.2d 732 (Court of Appeals of Washington, 1978)
Egbert v. Way
546 P.2d 1246 (Court of Appeals of Washington, 1976)
Smith v. Smith
484 P.2d 409 (Court of Appeals of Washington, 1971)
Golob v. George S. May International Co.
468 P.2d 707 (Court of Appeals of Washington, 1970)
Suchan v. Rutherford
410 P.2d 434 (Idaho Supreme Court, 1966)
Winkenwerder v. Knox
320 P.2d 304 (Washington Supreme Court, 1958)
Roth v. Speck
126 A.2d 153 (District of Columbia Court of Appeals, 1956)
Westland Construction Co. v. Chris Berg, Inc.
215 P.2d 683 (Washington Supreme Court, 1950)

Cite This Page — Counsel Stack

Bluebook (online)
193 P. 210, 113 Wash. 70, 1920 Wash. LEXIS 799, Counsel Stack Legal Research, https://law.counselstack.com/opinion/cahalan-investment-co-v-yakima-central-heating-co-wash-1920.