Bunge North America, Inc. v. AGRI Process Innovations, Inc.

CourtDistrict Court, E.D. Missouri
DecidedMarch 31, 2025
Docket2:24-cv-00042
StatusUnknown

This text of Bunge North America, Inc. v. AGRI Process Innovations, Inc. (Bunge North America, Inc. v. AGRI Process Innovations, Inc.) is published on Counsel Stack Legal Research, covering District Court, E.D. Missouri primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Bunge North America, Inc. v. AGRI Process Innovations, Inc., (E.D. Mo. 2025).

Opinion

UNITED STATES DISTRICT COURT EASTERN DISTRICT OF MISSOURI EASTERN DIVISION

BUNGE NORTH AMERICA, INC., ) ) Plaintiff, ) ) v. ) No. 2:24-cv-00042-HEA ) AGRI PROCESS INNOVATIONS, INC. ) et al., ) ) Defendants. )

OPINION, MEMORANDUM AND ORDER

This matter is before the Court on Defendant AGRI Process Innovations, Inc.’s Motion to Dismiss Count III. [Doc. 10]. Plaintiff opposes the motion. [Doc. 21]. The motion is fully briefed and ready for disposition. For the reasons stated below, the motion is granted. BACKGROUND1 This lawsuit involves the collapse of an 800,000-bushel grain bin located at the LaGrange Elevator (the “Bin”). [Doc. 1 ¶ 10]. Bunge North America, Inc. (“Bunge”) retained AGRI Process Innovations, Inc. (“API”) to design and prepare plans for a roll-up loader door to be installed in the Bin at ground level. [Id. ¶¶ 12,

1 The facts are taken from the Complaint and accepted as true for purposes of this motion. See Glick v. W. Power Sports, Inc., 944 F.3d 714, 717 (8th Cir. 2019). 23]. API provided completed design drawings for the Bin in August 2018. [Id. ¶ 24].

Bunge removed all grain from the Bin leaving it empty and ready for the new loader door; the Bin had been loaded to near capacity before it was emptied. [Id. ¶ 13]. Lawson Rigging & Fabrication, LLC (“Lawson”) fabricated and

installed the new loader door in the Bin in August or September 2018. [Id. ¶¶ 4, 14]. Lawson’s work included cutting a space for the doorframe, welding the doorframe to the wall of the Bin, and installing the door. [Id.]. SKS Engineers, LLC (“SKS”) inspected Lawson’s welds after installation of the door. [Id.

¶¶ 5, 15]. With the loader door installed and inspected, Bunge began gradually filling the Bin to near capacity in the days leading up to the collapse. [Id. ¶ 17]. On

March 11, 2019, the Bin collapsed and spilled nearly 45 million pounds of corn across LaGrange’s main street, to the railroad on the other side of the road, and into the Mississippi River. [Id. ¶ 18]. The sudden release damaged numerous nearby buildings and destroyed other buildings, truck scales, and truck dumps.

[Id.] A subsequent investigation revealed the original fracture that caused the collapse began at the loader door’s upper west corner. [Id. ¶ 19]. Additionally, the

investigation revealed that even if Lawson’s welds on the new door had been perfect, the loader door as designed would have failed once the Bin was loaded to capacity or near capacity—and under some circumstances, long before the Bin was

loaded halfway. [Id. ¶ 29]. Bunge filed this action against API, Lawson, and SKS alleging nine claims. The claims against API include Negligence (Count I), Professional Negligence

(Count II), and Breach of Express or Implied Warranty (Count III). Defendant API filed the instant motion pursuant to Federal Rule of Civil Procedure 12(b)(6) seeking dismissal of Count III for failure to state a claim. [Doc. 10]. LEGAL STANDARD

Under Federal Rule of Civil Procedure 12(b)(6), a court may dismiss an action for failure to state a claim upon which relief may be granted. When considering a Rule 12(b)(6) motion, a court assumes a plaintiff’s well-pled factual

allegations to be true and makes all reasonable inferences in the plaintiff’s favor. Glick v. W. Power Sports, Inc., 944 F.3d 714, 717 (8th Cir. 2019). But a court does not accept as true legal conclusions or “threadbare recitals of the elements of a cause of action supported by mere conclusory statements.” Ashcroft v. Iqbal, 556

U.S. 662, 678 (2009) (cleaned up). To survive a Rule 12(b)(6) motion, a complaint must allege sufficient facts to “state a claim to relief that is plausible on its face.” Iqbal, 556 U.S. at 678

(citing Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007)). If a claim fails to allege one of the elements necessary to recovery on a legal theory, the Court must dismiss that claim. Crest Constr. II, Inc. v. Doe, 660 F.3d 346, 355 (8th Cir.

2011). DISCUSSION In Count III of the Complaint, Bunge alleges that API, in preparing drawings

for the Bin door, “warranted, either explicitly or implicitly, that it would perform all work in a safe and workmanlike manner. . . .” [Doc. 1 at 8 ¶ 40]. Bunge asserts API breached its express and implied warranties because the drawings it provided constituted a deficient design that was destined to fail. [Id. ¶ 43]. More

specifically, Bunge alleges API failed to assess and account for the Bin’s size and dimensions. [Id.]. API argues Count III should be dismissed for failure to state a claim for

breach of express or implied warranties because: “(1) allegations pertaining solely to design defects are incapable of stating claims of breach of express warranty; (2) Bunge does not allege that API made any express (or implied) affirmations of fact pertaining to the quality of any goods; (3) Bunge does not allege the means by

which any express warranties were communicated to it by API; and (4) Missouri courts do not recognize claims of breach of implied warranty against engineers.” [Doc. 10 ¶ 10]. In its response to API’s motion, Bunge submitted two documents: (1) a purchase order from AP Fabrications, LLC related to a “Silo Slide Up Door Fab

and Install” in East Hannibal, Illinois dated May 30, 2018, [Doc. 21-1]; and (2) a construction Agreement between Bunge and AP Fabrications, LLC with regard to a project located in Lake Providence, Louisiana with an invoice dated June 4,

2018, [Doc. 21-2]. Although Bunge concedes it has not identified a purchase order or construction agreement pertaining to the LaGrange project, it argues the Court should infer express warranties based on the other projects. [Doc. 21 at 2]. Further, Bunge argues that Missouri law provides for implied warranties regardless

of whether there is a contract. [Id. at 4]. Because API provided a service—designing and preparing plans for the Bin door—the Missouri Uniform Commercial Code does not apply. See Busque v.

Heck, 587 S.W.3d 703, 707 (Mo. App. S.D. 2019) (citing Missouri Farmers Ass’n v. McBee, 787 S.W.2d 756, 760-61 (Mo. App. W.D. 1990) (“the UCC appl[ies] only to transactions in goods … [it] does not apply to service transactions.”). The issue, therefore, is whether Bunge states a claim under Missouri common law for

breach of express and/or implied warranties. This Court’s determination of Missouri law “is not to formulate the legal mind of the state, but merely to ascertain and apply it.” R.W. Murray Co. v. Shatterproof Glass Corp., 697 F.2d

818, 826 (8th Cir. 1983). Breach of Express Warranty “In actions on warranties that are not governed by the Uniform Commercial

Code, such as actions on express warranties made in connection with a contract for services, the elements of these actions include:” 1) all essential elements of a contract (i.e., parties with capacity, lawful and definite subject matter, consideration); 2) an affirmation or representation of fact by one party relating to the subject matter of the contract; reliance on the affirmation or representation by the other party; 3) falsity or inaccuracy of the affirmation or representation; and 4) damage to the other party as a result of the false or inaccurate affirmation or representation. § 9:2. Elements of the action, 35 Mo. Prac., Cont., Eq. & Stat. Actions Handbook.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Bell Atlantic Corp. v. Twombly
550 U.S. 544 (Supreme Court, 2007)
Ashcroft v. Iqbal
556 U.S. 662 (Supreme Court, 2009)
Crest Construction II, Inc. v. Doe
660 F.3d 346 (Eighth Circuit, 2011)
Business Men's Assurance Co. of America v. Graham
891 S.W.2d 438 (Missouri Court of Appeals, 1994)
Missouri Farmers Ass'n v. McBee
787 S.W.2d 756 (Missouri Court of Appeals, 1990)
Volume Services, Inc. v. C.F. Murphy & Associates, Inc.
656 S.W.2d 785 (Missouri Court of Appeals, 1983)
Chubb Group of Insurance Companies v. C.F. Murphy & Associates, Inc.
656 S.W.2d 766 (Missouri Court of Appeals, 1983)
O'DELL v. Custom Builders Corp.
560 S.W.2d 862 (Supreme Court of Missouri, 1978)
Kennedy v. Bowling
4 S.W.2d 438 (Supreme Court of Missouri, 1928)
Captiva Lake Investments, LLC v. Ameristructure, Inc.
436 S.W.3d 619 (Missouri Court of Appeals, 2014)
R.W. Murray Co. v. Shatterproof Glass Corp.
697 F.2d 818 (Eighth Circuit, 1983)

Cite This Page — Counsel Stack

Bluebook (online)
Bunge North America, Inc. v. AGRI Process Innovations, Inc., Counsel Stack Legal Research, https://law.counselstack.com/opinion/bunge-north-america-inc-v-agri-process-innovations-inc-moed-2025.