The case comes to us in a somewhat peculiar manner. The objection made to the assessments not only denies [133] the jurisdiction of the board of supervisors to levy the same upon appellant’s property, but also denies that the same was equitably apportioned. There appears, however, to have been a stipulation of the parties that the controversy should be submitted “on the legal questions involving jurisdiction and method of assessment, and if, in the opinion of the court, the case should be also submitted upon the amounts of such assessments, that question shall be submitted later, and both parties have the opportunity of introducing evidence. ’ ’ Such a method of trying a ease in piecemeal is not to be approved. The appeal from the assessment levied by the board brings the case into court for an adjudication of all the issues joined therein, and it is not competent for the parties by stipulation or otherwise to split them up and try them seriatim, reserving the right to have two or more judgments and two or more separate rights of appeal. The court, especially where the cause is tried in equity, should insist that the parties submit their case as an entirety, and let the whole controversy be settled by a single decree. The scope of the inquiry for the consideration of this court, as restricted by the stipulation referred to, and as limited by the argument of counsel, leaves us nothing to pass upon except the jurisdiction of the board of supervisors to order the improvement and levy the assessment. The determination of this issue is made to depend on the further question whether this drainage improvement involved the establishment of a new and independent drainage district or was simply a reconstruction, repair, or improvement made upon an existing system of drainage.

It is conceded that, several years prior to the proceedings now in question, two drainage districts, No. 3 and No. 21, were legally and properly established, and that the lands owned by the appellants, Brill and Wilson, are included within the territory of said District No. 3.. That the ditch provided for by said establishment was constructed, the cost thereof duly assessed upon all these lands, and the same duly paid, is also conceded. It is further agreed that, after said drain had been completed and had been in practical use for a period, one Carl Olson, owning certain lands in said District No. 3, presented a petition to the board of supervisors of Sac County, stating that the main drain in said district did not provide an adequate outlet for [134] the drainage of his and other lands in said district, and asked that the board appoint a competent engineer to make an examination and report a plan for the repair or reconstruction of said drpin, so that the lands within the district needing drainage might be provided with a more suitable outlet. Acting upon this petition, the board appointed one Holmes as engineer, to make the desired examination and report. The engineer’s report was to the effect that the ditch and tile were not laid deep enough nor of sufficient capacity to effectively drain a considerable portion of the district. He also reported, in substance, “that to reconstruct the entire line from the existing outlet up to the lands needing relief would be very expensive, and proposed a plan for an additional outlet, by beginning on the existing main and cutting through a ridge or elevation on the south side thereof to a point of discharge in that direction, thus saving distance and expense. This plan, he said, was considerably shorter than to follow down the old line, but deeper for a short distance only, and would drain the lands under consideration and relieve all lands below it to such an extent that no new line would be necessary to the present tile outlet.” Going beyond the requirements of his appointment, the engineer added a recommendation that the lands included in District No. 3 and District No. 21, together with additional lands shown on certain maps, be included in one district. Notice of hearing before the board upon the Olson petition was duly published. The appellants' herein, with others, appeared to these proceedings, and objected thereto. When the hearing was finally had, the engineer’s report was approved, the objections thereto were overruled, and the proposed improvement was ordered made. From this order none of the objectors appealed. Claims for damages were settled, and after due advertisement, the contract for the work was let. Thereafter, commissioners were appointed, to assess the cost and expenses so incurred. Upon the hearing before the board, the appellants herein appeared and filed objections to the assessment upon their lands. These objections were to the effect that their lands were duly assessed for the original improvement of District No. 3, and that the assessments have been paid; that the improvement as originally made served its purpose; and that plaintiffs have tiled and improved their [135] lands in connection therewith. It is further alleged, in substance, that, while the Olson petition was for repair or reconstruction of an existing drain in an existing district, and not for the establishment of a new drainage district, and conferred no jurisdiction upon the board to establish one, the board did proceed, without authority, to éstablish a new drainage district known as No. 73, including the lands of the appellants, and unlawfully and without authority levied the disputed assessments, to pay the costs and expense so incurred.

Free access — add to your briefcase to read the full text and ask questions with AI

Brill v. Board of Supervisors, 195 Iowa 132 (iowa 1923).

195 Iowa 132 (Brill v. Board of Supervisors) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Schwarz Farm Corp. v. Board of Sup. of Hamilton Co.
196 N.W.2d 571 (Supreme Court of Iowa, 1972)