Bowes v. City of Chicago

120 N.E.2d 15, 3 Ill. 2d 175, 1954 Ill. LEXIS 401
CourtIllinois Supreme Court
DecidedMay 24, 1954
Docket33122
StatusPublished
Cited by104 cases

This text of 120 N.E.2d 15 (Bowes v. City of Chicago) is published on Counsel Stack Legal Research, covering Illinois Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Bowes v. City of Chicago, 120 N.E.2d 15, 3 Ill. 2d 175, 1954 Ill. LEXIS 401 (Ill. 1954).

Opinion

Mr. Justice HershEy

delivered the opinion of the court:

This is an appeal from an order of the circuit court of Cook County granting the plaintiffs-appellees a permanent injunction enjoining and restraining the defendants-appellants from constructing a water filtration plant in Chicago harbor. Hereafter in this opinion the parties will be referred to as they were designated in the circuit court of Cook County. The case comes to this court on appeal on the grounds that the validity of a statute, the construction of the constitution and the validity of a municipal ordinance are involved.

In the action below the plaintiffs sought to enjoin the city of Chicago from constructing a water filtration plant in Chicago harbor. The plaintiffs also sought to enjoin the Chicago Park District from consenting to such construction and to enjoin the defendant Great Lakes Dredge & Dock Co., a corporation, which had a contract with the city for some preliminary construction, from performing under said contract with the city. The water filtration plant under the proposed plans for construction was to be located in an area lying north of Navy Pier in the northerly half ■ of the outer, basin of Chicago harbor and of Harbor District No. 1 of the city of Chicago, the south line of this site being a line parallel with and 400 feet north of the north line of Navy Pier. The proposed plant has an area, at the surface of Lake Michigan, of approximately 61 acres. The highest structure of the plant is to be 62 feet above the water level of the lake. The southwest corner of the proposed site is 500 feet from Lake Shore Drive and the northwest corner is 1550 feet from the drive. The indicated cost of construction is $85,000,000.

The many plaintiffs in this proceeding are grouped into four different categories: (1) a group of persons suing as citizens of the State of Illinois; (2) a group of persons suing as the owners of real estate and as taxpayers thereon, and also some fourteen of said group suing as water rate payers; (3) a group of persons, four in number, claiming to have contract and property rights that would be damaged by the construction of the filtration plant; and (4) two associations suing in furtherance of the interests of their members.

The trial court dismissed for want of equity the complaint with respect to groups (1) and (4). No appeal has been taken to this court from such dismissal. As a result of such ruling the only plaintiffs appearing in this court are those denominated as groups (2) and (3).

The group of plaintiffs suing as taxpayers are 43 separate owners of real estate in the city of Chicago, each of whom joins in this action by reason of ownership of and payment of general taxes extended against real estate located in the city of Chicago. It is contended by this group of plaintiffs that while the city proposed to build the filtration plant solely from water funds and the proceeds of waterworks certificates of indebtedness and not from general funds, the city did, however, obligate the general funds to a certain degree. The permit issued by the Secretary of the Army to the city of Chicago provided in paragraph 6 thereof, “that if future operations by the United States require an alteration in the position of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army, it shall cause unreasonable obstruction to the free navigation of said water, the owner will be required, upon due notice from the Secretary of the Army, to remove or alter the structural work or obstructions caused thereby without expense to the United States, so as to render navigation reasonably free, easy, and unobstructed; and if, upon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed, the owner shall, without expense to the United States, and to such extent and in such time and manner as the Secretary of the Army may require, remove all or any portion of the uncompleted structure or fill and restore to its former condition the navigable capacity of the water course.” It is thus contended by this group of plaintiffs that at some future date the _ city may be required at its own expense to remove the entire filtration plant and restore the harbor to its original state. Moreover, the permit is to expire on December 21, 1955, and if at that time the city has not completed the filtration plant it will be required to remove all or any portion of the uncompleted structure and restore the harbor to its former condition. It is further required in the permit, by paragraph 12 thereof, that whenever commercial navigation requires and at the request of the district engineer .the city of Chicago must dredge the approach channel and slip indicated on the permit. Furthermore, paragraph 13 of. the permit requires the city of Chicago, when requested by the district engineer, to reimburse the corps of engineers in the amount of 25 percent of any expense involved in dredging shoals caused by accretion to the entrance channel between the gap in the outer breakwater and the lock in the mouth of the Chicago River. These plaintiffs further point..out that-if-the water fund were large enough to cover these expenditures, the city would be powerless to use the fund for that purpose. The Revised Cities and Villages Act expressly limits expenditures from the water fund to paying (1) the cost of maintenance and operation of the waterworks system, (2) obligations of the municipality theretofore issued that are payable by their terms from this revenue, and (3) certificates issued under certain other sections of the Revised Cities and Villages Act. (Ill. Rev. Stat. 1953, chap. 24, par. 22-28.) Clearly, therefore, expenditures made by the city, in pursuance of the above-mentioned paragraph of the Federal permit, would necessarily have to be made from the general fund of the city of Chicago. This court stated in the case of Price v. City of Mattoon, 364 Ill. 512, that taxpayers were not proper parties to question the legality of a bond issue of the city of Mattoon, issued for the purpose of buying the water system of the local utility company and to start construction of a softening and filtration plant, for the reason that the bond issue was to be financed solely out of revenue derived from the sale of water to consumers and not out of any tax or taxes levied. The court stated that the purchase under such circumstances created no liability against the general funds of the city and no special liability on the city. Therefore, inasmuch as the purchase of the supply plant in the above matter would not result in the use of the taxpayers’ money, the complainants had no right to enjoin the carrying out of the ordinances as taxpayers nor did they have such right as citizens to intervene to prevent an injury to purely public rights or property when none of them suffered a special or irreparable injury different in degree and kind from that suffered by the public at large. The court further stated that even though by some unforeseen contingency arising in the future the city might be required to make up a deficiency in public funds such speculative possibility could give no comfort to those plaintiffs, for in the matter at issue neither a debt nor a public fund of the city was directly or contingently involved.

In the situation at hand it is the general fund of the city of Chicago that is involved. Moreover, this is not a case of an unforeseen contingency arising in the future.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

CB Construction & Design, LLC v. Atlas Brookview, LLC
2021 IL App (1st) 200924 (Appellate Court of Illinois, 2021)
Monson v. City of Danville
2018 IL 122486 (Illinois Supreme Court, 2019)
Friends of the Parks v. Chicago Park District
160 F. Supp. 3d 1060 (N.D. Illinois, 2016)
Chamberlain v. The Civil Service Commission of the Village of Gurnee, Illinois
2014 IL App (2d) 120884 (Appellate Court of Illinois, 2014)
Murray v. Chicago Youth Center
864 N.E.2d 176 (Illinois Supreme Court, 2007)
Village of Chatham v. County of Sangamon
837 N.E.2d 29 (Illinois Supreme Court, 2005)
Paszkowski v. Metropolitan Water Reclamation District
820 N.E.2d 401 (Illinois Supreme Court, 2004)
Barragan v. OSMAN CONST. CORP.
815 N.E.2d 842 (Appellate Court of Illinois, 2004)
Barragan v. Osman Construction Corp.
815 N.E.2d 842 (Appellate Court of Illinois, 2004)
Wauconda Fire Protection District v. Stonewall Orchards, LLP
797 N.E.2d 1130 (Appellate Court of Illinois, 2003)
Seiler v. Zeigler Coal Holding Co.
782 N.E.2d 316 (Appellate Court of Illinois, 2002)
Allstate Insurance Co. v. Menards, Inc.
782 N.E.2d 258 (Illinois Supreme Court, 2002)
Allstate Ins. Co. v. Menards, Inc.
782 N.E.2d 258 (Illinois Supreme Court, 2002)
County of Lake v. Fox Waterway Agency
Appellate Court of Illinois, 2001
Bailey v. Allstate Development Corp.
Appellate Court of Illinois, 2000
Roark v. Macoupin Creek Drainage District
Appellate Court of Illinois, 2000
Graduate Employees Organization v. Illinois Educational Labor Relations Board
315 Ill. App. 3d 278 (Appellate Court of Illinois, 2000)
Graduate Emp. Org. ift/aft, Afl-Cio v. Educ. Labor Rel. Bd.
733 N.E.2d 759 (Appellate Court of Illinois, 2000)

Cite This Page — Counsel Stack

Bluebook (online)
120 N.E.2d 15, 3 Ill. 2d 175, 1954 Ill. LEXIS 401, Counsel Stack Legal Research, https://law.counselstack.com/opinion/bowes-v-city-of-chicago-ill-1954.