Blue v. Louisiana Power & Light Co.

619 So. 2d 726, 1993 La. App. LEXIS 1956, 1993 WL 178142
CourtLouisiana Court of Appeal
DecidedMay 27, 1993
DocketNo. 92-CA-2121
StatusPublished

This text of 619 So. 2d 726 (Blue v. Louisiana Power & Light Co.) is published on Counsel Stack Legal Research, covering Louisiana Court of Appeal primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Blue v. Louisiana Power & Light Co., 619 So. 2d 726, 1993 La. App. LEXIS 1956, 1993 WL 178142 (La. Ct. App. 1993).

Opinion

SCHOTT, Chief Judge.

Plaintiff was injured by electricity when a crane or “cherry picker” he was using made contact with defendant’s power lines. The trial court dismissed his suit for damages and he has appealed. We affirm.

Plaintiff was employed by Professional Steel Fabricators as the superintendent of a crew working on the construction of a coal handling facility in Darrow, Louisiana. The facility was to consist of an area on the Mississippi River side of the levee commonly known as the batture and an area beyond the levee and the highway which was parallel to the levee. In the batture area coal was to be unloaded from ships or barges and would be transferred to the storage area across the highway and levee by an overhead conveyor. When this accident happened on April 14, 1983, coal had been unloaded and stacked in the batture area, but construction of the conveyor had not yet begun. The coal was being transported from the batture by dump trucks on a road which traversed the levee and crossed the highway to the coal storage area. Defendant’s power lines were located alongside the highway, on the land side, and over the road used by the dump trucks. These lines consisted of three primary phases carrying 13,800 volts and a neutral. The primary wires were strung on cross arms on poles and the neutral was below the cross arms.

On the day of the accident the Mississippi River had been rising to the point where the batture was about to be flooded. It was necessary for plaintiff to move Professional Steel’s equipment to the other side of the levee. This equipment included a ten-feet tall horse trailer converted for use as a tool storage shed. Plaintiff decided to move the trailer with a crane or cherry picker which was being used on the batture by Professional Steel. Joseph Moran, also an employee of Professional Steel operated the crane. Under plaintiff’s direction Moran hoisted the trailer with the crane and drove it on the road up and over the levee. Plaintiff went on the highway to stop traffic for the crane. As the crane crossed the highway it came into contact with the neutral line. Plaintiff said his back was to the crane at the time but he heard a popping or crackling noise when contact was made. Moran said the line “sizzled and broke”; it made “fireworks”. • Moran backed the crane off the highway and at plaintiff’s direction he lowered the trailer so that plaintiff could guide it at ground level.

At this point there is a direct conflict between plaintiff and Moran as to what occurred. Plaintiff stated that he directed Moran to lower the boom of the crane so that it could pass under the wires when, without any directions from him, Moran came forward with the crane until the boom came into contact with the primary wires causing electricity to pass through the cable and the trailer and into the body of the plaintiff as he was holding on to the trailer. According to Moran he was following plaintiff’s hand signals when he retracted the crane’s boom somewhat and went forward relying on plaintiff’s directions and thinking he would clear the [728]*728wires. In reasons for judgment the trial judge resolved this conflict as follows:

The operator of the cherry picker testified that Mr. Blue signaled him forward and he struck the power lines. Mr. Blue denied that he gave any signal for the cherry picker to move forward. The court finds that Mr. Blue did signal for the cherry picker to move forward.

We accept the trial court’s resolution of this conflict.

Each party produced a surveyor who, after the accident, measured the height of the power lines above the roadway. Plaintiff’s surveyor said they were 19.1', 20.1' and 20.4' above, while defendant’s said they were 20', 20.22' and 20.6' above. The trial judge found they were “about 20 feet off the ground.” That finding is not clearly wrong, but that was the height after the accident. The record shows that the height of the lines was reduced in the accident because one of the poles was pushed over. Consequently, all wires were more than twenty feet above the ground before the accident. The record shows that the boom of the crane was twenty-four feet above the ground when contact was made between the power line and the cable.

Weeks before the accident officials of Professional Steel and the coal facility’s owner, L & L Fleeting, had been negotiating with defendant to provide the electrical service needed to operate several large motors and to raise the power lines in order to clear the conveyor which was to be built. All necessary arrangements had been made for this phase of the work to begin on April 15. Plaintiff produced an expert who testified that defendant was obliged by the rules and interpretations of the National Electric Safety Code to determine what equipment was being used on this job and to raise the lines to accommodate the dump trucks as well as the crane. Defendant produced an equally qualified expert who flatly disagreed saying the Code contained no such requirements.

Plaintiff’s expert stated that the power lines were too low for the dump trucks using the road, but this testimony was flatly contradicted by defendant’s expert. The record shows that the height of the lines was in compliance with code requirements and the lines would never have been a problem for the dump trucks. Inherent in the decision of the trial court was its acceptance of the opinions of defendant’s expert over plaintiffs. The record provides no basis for this court to reach a different conclusion. The presence of the crane on the job was not related to the power lines except for this unanticipated emergency to move the equipment from the batture and plaintiff’s decision to move the trailer using the crane. Otherwise the crane would have stayed on the batture and never gone near the power lines.

This accident was most unfortunate for plaintiff, but he alone caused it. When the crane struck the neutral line plaintiff was given a dramatic warning of the hazard he was creating. Instead of heeding that warning he directed Moran to move the crane toward the wires without seeing the obvious, i.e., that the crane was bound to come into contact with the wires a second time. Plaintiff was an experienced, intelligent man who knew the dangers of operating tall equipment under power lines. He admitted that he was familiar with the “ten-foot” rule which requires that a crane should not be operated within ten feet of a power line. He stated that this rule was cited by a decal which was on the crane, and he knew that the crane could not possibly clear the lines by ten feet. It seems obvious that the facts of the case cannot support a judgment in his behalf.

Nevertheless, plaintiff argues that he is entitled to a judgment as a matter of law found in a number of cases, especially Levi v. S.W. La. Elec. Membership Co-op, 542 So.2d 1081 (La.1989). This recent case is a comprehensive treatment by the Supreme Court of the duty of a power company in an industrial setting to a workman who is injured in an accident like the one we are presently considering. After carefully reviewing the case, we have readily concluded that instead of supporting plaintiff’s position it clearly supports the judgment of the trial court.

[729]*729Some of the Levi

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Levi v. SW La. Elec. Membership Co-Op.
542 So. 2d 1081 (Supreme Court of Louisiana, 1989)
Kent v. Gulf States Utilities Co.
418 So. 2d 493 (Supreme Court of Louisiana, 1982)

Cite This Page — Counsel Stack

Bluebook (online)
619 So. 2d 726, 1993 La. App. LEXIS 1956, 1993 WL 178142, Counsel Stack Legal Research, https://law.counselstack.com/opinion/blue-v-louisiana-power-light-co-lactapp-1993.