Berkeley Hillside Preservation v. City of Berkeley

Procedural entryThis page is a short order in Berkeley Hillside Preservation v. City of Berkeley. Read the opinion of the Court — 241 Cal. App. 4th 943
California Court of Appeal·Decided October 27, 2015·No. A131254·Published

Opinion

Filed 9/23/15; pub. order 10/15/15 (see end of opn.)

IN THE COURT OF APPEAL OF THE STATE OF CALIFORNIA

FIRST APPELLATE DISTRICT

DIVISION FOUR

BERKELEY HILLSIDE PRESERVATION et al., Plaintiffs and Appellants, v. A131254 CITY OF BERKELEY et al., (Alameda County Defendants and Respondents; Super. Ct. No. RG10517314) DONN LOGAN et al., Real Parties in Interest and Respondents.

Real parties in interest and respondents Mitchell Kapor and Freada Kapor-Klein secured permits from respondent City of Berkeley (City) to build a large home on a large lot in the Berkeley hills, and appellants Berkeley Hillside Preservation and Susan Nunes Fadley challenged the project under the California Environmental Quality Act (CEQA, Pub. Resources Code, § 21000 et seq.).1 The first time we considered this challenge, we concluded, contrary to the City’s determination, that the project presented unusual circumstances, thus triggering an exception to CEQA’s categorical exemptions (Cal. Code Regs., tit. 14, § 15300.2, subd. (c); see id., § 15000 et seq., Guidelines for Implementation of CEQA (Guidelines)) and requiring the preparation of an environmental impact report (EIR). The Supreme Court reversed, held that a potentially

1 All statutory references are to the Public Resources Code. 1 significant environmental effect is not alone sufficient to trigger the unusual circumstances exception, and provided detailed guidance on the applicable standards of review in a challenge to an agency’s determination that the unusual circumstances exception is inapplicable. The Court remanded to us so that we could properly analyze whether the exception applies. Having done so, we now conclude that sufficient evidence supports the City’s conclusion the project is categorically exempt from further CEQA review. We therefore affirm the trial court’s order denying appellants’ petition for a writ of mandate. I. FACTUAL AND PROCEDURAL BACKGROUND2 Kapor and Kapor-Klein want to build a large house on a lot they own on Rose Street. “The lot is on a steep slope (approximately 50 percent grade) in a heavily wooded area. In May 2009, their architect applied to the City for a use permit to demolish the existing house on the lot and to build a 6,478-square-foot house with an attached 3,394- square-foot 10-car garage. The residence would be built on two floors, would include an open-air lower level, and would cover about 16 percent of the lot.” (Berkeley Hillside Preservation v. City of Berkeley (2015) 60 Cal.4th 1086, 1093 (Berkeley Hillside).) The City’s zoning adjustments board (Board), after holding a public hearing and receiving comments about the project, approved the use permit in January 2010. It found the project exempt from CEQA review under two different categorical CEQA exemptions, which are “classes of projects that have been determined not to have a significant effect on the environment.” (§ 21084, subd. (a).) The first exemption, “Class 3,” includes “construction and location of limited numbers of new, small facilities or structures,” including “[o]ne single-family residence, or a second dwelling unit in a residential zone,” and “up to three single-family residences” “[i]n urbanized areas.” (Guidelines § 15303, subd. (a).) The second exemption, “Class 32,” applies to a project

2 The Supreme Court summarized the relevant factual and procedural background of this case, and we quote its opinion liberally. 2 “characterized as in-fill development” meeting the following conditions: (1) it “is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations”; (2) it “occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses”; (3) its “site has no value[] as habitat for endangered, rare or threatened species” and “can be adequately served by all required utilities and public services”; and (4) its approval “would not result in any significant effects relating to traffic, noise, air quality, or water quality.” (Guidelines, § 15332; accord, Berkeley Hillside, supra, 60 Cal.4th at p. 1093.) Guidelines section 15300.2, subdivision (c) provides an exception to CEQA’s categorical exemptions. It provides: “A categorical exemption shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances.” We refer to this as the unusual circumstances exception. The Board found that the exception did not apply because the project as proposed and approved would not have any significant effects on the environment due to unusual circumstances. The Board approved (1) a use permit to demolish the existing dwelling on the lot, (2) a use permit to construct the proposed unit, (3) an administrative use permit to allow a 35-foot average height limit for the main building (with 28 feet being the maximum usually allowed), and (4) an administrative use permit to reduce the setback of the front yard to 16 feet (with 20 feet usually required). The Board imposed various “standard conditions” on the proposed construction, including requiring the permit applicant to secure a construction traffic management plan, comply with storm water regulations for small construction activities, and take steps to minimize erosion and landslides when construction takes place during the wet season. “Several residents of the City, including appellant Susan Nunes Fadley, filed an appeal with the [Berkeley] city council, arguing in part that CEQA’s categorical exemptions do not apply because the proposed project’s ‘unusual size, location, nature and scope will have significant environmental impact on its surroundings.’ They asserted

3 that the proposed residence would be ‘one of the largest houses in Berkeley, four times the average house size in its vicinity, and situated in a canyon where the existing houses are of a much smaller scale.’ They submitted evidence that, of Berkeley’s over 17,000 single-family residences, only 17 exceed 6,000 square feet, only 10 exceed 6,400 square feet, and only one exceeds 9,000 square feet. They also asserted that the proposed residence would exceed the maximum allowable height under Berkeley’s municipal code and would be inconsistent with the policies of the City’s general plan, and that an EIR [environmental impact report] is appropriate to evaluate the proposed construction’s potential impact on noise, air quality, historic resources, and neighborhood safety. In response, the City’s director of planning and development stated that 16 residences within 300 feet of the project have a greater floor-area-to-lot-area ratio and that 68 Berkeley ‘dwellings’ exceed 6,000 square feet, nine exceed 9,000 square feet, and five exceed 10,000 square feet. “The city council received numerous letters and e-mails regarding the appeal, some in support and some in opposition. Among the appeal’s supporters was Lawrence Karp, an architect and geotechnical engineer. In a letter dated April 16, 2010, Karp stated (1) he had reviewed the architectural plans and topographical survey filed with the Board, and had visited the proposed construction site; (2) ‘[p]ortions of the major fill for the project are shown to be placed on an existing slope inclined at about 42º (~1.1h:1v) to create a new slope more than 50º (~0.8:1v)’; (3) ‘[t]hese slopes cannot be constructed by earthwork and all fill must be benched and keyed into the slope which is not shown in the sections or accounted for in the earthwork quantities.

Free access — add to your briefcase to read the full text and ask questions with AI

Berkeley Hillside Preservation v. City of Berkeley, (Cal. Ct. App. 2015).

Berkeley Hillside Preservation v. City of Berkeley (Berkeley Hillside Preservation v. City of Berkeley) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Salmon Protection & Watershed Network v. County of Marin
23 Cal. Rptr. 3d 321 (California Court of Appeal, 2005)
Ass'n for Protection of Environmental Values v. City of Ukiah
2 Cal. App. 4th 720 (California Court of Appeal, 1991)
Fairbank v. City of Mill Valley
89 Cal. Rptr. 2d 233 (California Court of Appeal, 1999)
Save the Plastic Bag Coalition v. City and County of San Francisco CA1/2
222 Cal. App. 4th 863 (California Court of Appeal, 2013)
Lotus v. Department of Transportation
223 Cal. App. 4th 645 (California Court of Appeal, 2014)
Berkeley Hillside Preservation v. City of Berkeley
343 P.3d 834 (California Supreme Court, 2015)