Belsky v. County of Dodge

369 N.W.2d 46, 220 Neb. 76, 1985 Neb. LEXIS 1046
CourtNebraska Supreme Court
DecidedMay 31, 1985
Docket83-870
StatusPublished
Cited by11 cases

This text of 369 N.W.2d 46 (Belsky v. County of Dodge) is published on Counsel Stack Legal Research, covering Nebraska Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Belsky v. County of Dodge, 369 N.W.2d 46, 220 Neb. 76, 1985 Neb. LEXIS 1046 (Neb. 1985).

Opinion

*77 Shanahan, J.

In the district court for Dodge County, Lawrence and Marie Belsky (Belsky), owners of an 80-acre farm (south half of the southeast quarter of Section 27, Township 20 North, Range 5 East of the 6th P.M.), requested an injunction against the County of Dodge, the county’s supervisors and highway superintendent, and Webster Township to prevent obstruction of drainage from Belsky’s farm. Belsky’s son, Larry, and his wife, Kathleen, own an 80-acre farm (north half of the northeast quarter of Section 34, Township 20 North, Range 5 East of the 6th P.M.), south of the farm owned by Lawrence and Marie. The farms owned by the Belsky families are separated by an east-west county road. On the east side of Belsky’s farm is a north-south township road. Pebble Creek is a drainway running generally northeasterly through Belsky’s farm. The source of water for Pebble Creek is rain and melted snow, but the creek is dry approximately 90 percent of the time. The outlet for Pebble Creek is undisclosed.

*78 Land on both sides of the township road is devoted to agriculture. Before 1979, area. drainage collected in a depression near the southeast corner of Belsky’s farm, approximately 300 to 400 feet south of the bridge for the township road. The collected water drained eastward across the road and rendered it impassable much of the time. Belsky complained to Dodge County about drainage from his farm and the intermittent water problem on the township road. Dodge County, in 1979, undertook extensive grade work on the road and built a new bridge across Pebble Creek. In connection with the county’s project to remedy the drainage problem, Belsky indicated he would take the bow out of Pebble Creek across his farm to provide more direct flow from the county road bridge to the location of the new bridge.

Before the 1979 project, fields immediately adjacent to the road had an elevation the same as the road. The opening beneath the old bridge on the township road was 105 square feet, although the greater part of such opening was clogged with debris.

The new bridge’s opening is 313 square feet. This new bridge did not intercept Pebble Creek at a right angle. Rather, contemplating Belsky’s straightening the creek, the county constructed its new bridge in a northwesterly-southeasterly direction so that an oblique angle was formed as the bridge crossed Pebble Creek. In this manner water in Pebble Creek, after removal of the creek bow by Belsky, would flow perpendicular to the opening beneath the new bridge for direct and unobstructed passage. In constructing the new bridge with its larger opening for passage of water, the county elevated the bridge approach of the road 2.4 feet. This increased elevation caused previously eastward draining water to run north on the west side of the road and then into Pebble Creek at the site of the new bridge. Additionally, after the increased road elevation, water collects on Sections 26 and 27 at an identical level on both sides of the road. Belsky never straightened the bow of Pebble Creek as it crossed his farm.

Belsky filed suit, asserting that the defendants by “negligent, wrongful and unlawful acts” have caused irreparable injury, namely, the opening beneath the new bridge was insufficient for *79 passage of water in a watercourse and the postconstruction elevation of the township road obstructed a natural drainway, resulting in flooding and standing water on Belsky’s farm. Belsky prayed for restoration of drainage as such existed before the 1979 bridge-road construction. On the other hand, Dodge County contends that water had drained across the previous township road because the debris-clogged opening under the old bridge was insufficient for passage of Pebble Creek and caused the creek to back up and drain across the old road. The county also contends that design of the bridge was modified in the light of Belsky’s assurance that he would straighten Pebble Creek across his farm and that Belsky’s failure to do so bars equitable relief.

At trial all expert witnesses agreed that the increased elevation of the township road may contribute to an increased depth and duration of standing water.

Belsky’s expert witness testified that the opening under the new bridge is inadequate to accommodate area drainage in the event of a 50-year storm. A 50-year storm has a 2-percent chance of occurring in any given year. In the opinion of Belsky’s expert, a bridge opening of 427 square feet was necessary for adequate drainage from a 50-year storm. To obtain an opening of 427 square feet, it would be necessary to raise the new bridge another 2 feet above its present elevation or dredge a deeper channel for Pebble Creek beneath the new bridge.

An expert witness for Belsky also testified that water would be found on both sides of the road, that is, on Sections 26 and 27, even if there had been no road separating the sections; that the new road did not create backwater on section 34; and that there would be standing water on Section 27 irrespective of the county’s “improvements.”

The new bridge was constructed to handle runoff from a 25-year storm. A 25-year storm has a 4-percent chance of occurring in any given year. The 25-year standard is widely utilized by state and public subdivisions in bridge design and construction. The new bridge’s capacity for passage of water is greater than the capacity of the county road bridge located south of the new bridge and upstream on Pebble Creek. Water will leave Pebble Creek somewhere south of the new bridge *80 before there is any obstruction to the creek as it flows toward and passes beneath the new bridge. Overbank flows of Pebble Creek can be expected at 1.4- to 2.5-year frequencies and will move in a northeasterly direction parallel to Pebble Creek. These overbank flows eventually leave Belsky’s farm by way of the creek channel under the new bridge. On account of the increased capacity for drainage beneath the new bridge, the road-bridge project has improved area drainage, including drainage from Belsky’s farm.

The county’s expert testified that previous drainage had flowed easily across the old road because the maintained road was capable of conducting a greater flow of water than would be conveyed by agricultural land on either side of the road. As explained by such expert witness, more water was conducted by the old road than by the adjacent cultivated fields because crops in the fields caused a “retardance” to flow, whereas the maintained road, due to an absence of surface obstruction such as vegetation or crops, permitted a greater conveyance of water over the road’s surface.

Apart from Pebble Creek, there was no evidence concerning existence or location of a natural drainway for Belsky’s farm before installation of a road.

The district court found that Belsky had failed to prove negligence or the existence of a watercourse and dismissed Belsky’s action.

For assignments of error Belsky claims the district court erred (1) in determining a statutory watercourse did not exist; (2) in applying the common enemy rule regarding surface waters; and (3) in finding that the county had provided for sufficient passage of all waters reasonably anticipated to flow beneath the new bridge placed in a natural drainway.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Spady v. Pughes
33 Neb. Ct. App. 373 (Nebraska Court of Appeals, 2025)
Riha v. FirsTier Bank
539 N.W.2d 632 (Nebraska Supreme Court, 1995)
Barthel v. Liermann
509 N.W.2d 660 (Nebraska Court of Appeals, 1993)
Nu-Dwarf Farms, Inc. v. Stratbucker Farms, Ltd.
470 N.W.2d 772 (Nebraska Supreme Court, 1991)
Romshek v. Osantowski
466 N.W.2d 482 (Nebraska Supreme Court, 1991)
Gruber v. County of Dawson
439 N.W.2d 446 (Nebraska Supreme Court, 1989)
D & R Realty v. Bender
431 N.W.2d 920 (Nebraska Supreme Court, 1988)
Holman v. Papio Natural Resources District
421 N.W.2d 430 (Nebraska Supreme Court, 1988)
Slusarski v. County of Platte
416 N.W.2d 213 (Nebraska Supreme Court, 1987)
Hughes v. Enterprise Irrigation District
410 N.W.2d 494 (Nebraska Supreme Court, 1987)

Cite This Page — Counsel Stack

Bluebook (online)
369 N.W.2d 46, 220 Neb. 76, 1985 Neb. LEXIS 1046, Counsel Stack Legal Research, https://law.counselstack.com/opinion/belsky-v-county-of-dodge-neb-1985.