Basin Exploration Inc. v. Tidewater Inc.

139 F. App'x 605
CourtCourt of Appeals for the Fifth Circuit
DecidedJuly 12, 2005
Docket04-30395
StatusUnpublished

This text of 139 F. App'x 605 (Basin Exploration Inc. v. Tidewater Inc.) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fifth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Basin Exploration Inc. v. Tidewater Inc., 139 F. App'x 605 (5th Cir. 2005).

Opinion

PER CURIAM: *

Tidewater Inc and Jackson Marine, L.L.C., in personam, and the M/V SARA TIDE, in rem (collectively, Tidewater) appeal the district court’s judgment in favor of Basin Exploration, Inc., Stone Energy, L.L.C., and Stone Energy Corporation (collectively, Basin), for damages occasioned by an allision between a Tidewater vessel and an oil and gas well owned by Basin. Only the amount of damages awarded is challenged. We affirm.

Facts and Proceedings Below

On July 26, 2000, the MTV SARA TIDE, a Tidewater supply vessel, struck Basin’s well, well number 10 in the West Cameron Block 45 field in the Gulf of Mexico off the Louisiana coast. The allision bent the well more than 70 degrees down toward the sea floor, leaving the entire structure under water. The two outermost layers of the well casing were split open, the pipeline connections to the well were torn off, and the platform was destroyed. Tidewater does and did not contest liability, so that the sole issue between the parties is the amount of damages awarded.

*607 Basin decided to plug and abandon (P & A) the well, which had been shut-in (out of production and closed with temporary plugs) since 1986. The year following the allision, Basin sued Tidewater in the district court below, seeking damages for the P & A costs and the cost of drilling a replacement well. Basin contended that it had planned to use the structure and casings of the No. 10 well to drill a sidetrack well from there into the field at a nearby location. The district court awarded Basin a total of $3,847,802 plus prejudgment interest from the date of loss. This award included $2,079,172 in out-of-pocket costs for the P & A operation and debris cleanup, $458,630 as the extra cost of the replacement well compared to the originally planned sidetrack well, $780,000 for a replacement platform and $530,000 for replacement flow lines.

Discussion

In general, the injured party in a tort action is entitled to be placed in as good a position financially as if the injury had not occurred. Gaines Towing and Transp., Inc. v. Atlantia Tanker Corp., 191 F.3d 633, 635 (5th Cir.1999). In a maritime action, recovery is limited to economically justified expenditures. See id. (when the cost to repair a vessel exceeds the market value of the vessel, recovery is limited to the market value).

Tidewater argues that there were insufficient gas reserves in the field surrounding Basin’s well to economically justify replacement of the well. If drilling a replacement well was not economically justifiable, then Tidewater should not be assessed damages for it. In addition, if further drilling in the field was not economically viable, Basin would have been obligated to permanently plug and abandon the well at some point even if there had been no allision. Tidewater therefore argues that damages assessed should be reduced by the cost of this eventual P & A operation, making Tidewater liable only for the additional P & A costs occasioned by the allision.

Even if the field was viable, Tidewater argues that the well could have been repaired at a lower cost than the combined cost of the P & A and the well replacement (minus the sidetrack costs). Therefore, according to Tidewater, Basin’s recovery should be capped at the amount that the well could have been repaired for, estimated by Tidewater’s expert to be $900,000.

I. Standard of Review

On appeal from a judgment after a bench trial, this court reviews legal issues de novo and findings of fact for clear error. Houston Exploration Co. v. Halliburton Energy Servs., Inc., 359 F.3d 777, 779 (5th Cir.2004). A clearly erroneous finding is one that gives a reviewing court a “definite and firm conviction that a mistake has been committed.” Anderson v. City of Bessemer City, 470 U.S. 564, 105 S.Ct. 1504, 1511, 84 L.Ed.2d 518 (1985). A fact-finder’s choice between two permissible views of the evidence cannot be clearly erroneous, even if the reviewing court would have decided the case differently. Id.

II. Gas Reserves

Basin presented testimony from two employees, Bruce McDonald (McDonald) and Randy Young (Young), a geologist and a petroleum engineer, on their estimate of the proved gas reserves accessible from the vicinity of the destroyed well. 1 These employees had estimated the proved reserves at 2.9 billion cubic feet *608 (BCF), but had used a more conservative estimate, 2.3 BCF, for purposes of reporting Basin’s assets as required by the Securities and Exchange Commission (SEC) and calculating projected profits from extraction of the gas. Young testified that these profit projections ranged from $14.8 million to $4.8 million between late 2000 and mid-2001, depending on the price of gas at the time the projections were made. Basin also presented evidence of a prior proved reserves estimate made by another Basin geologist, and a very similar estimate made by a third-party auditor. Although these earlier analyses indicated different boundaries for the reservoir than those determined by McDonald and Young, the earlier proved reserves projection was also 2.3 BCF.

Tidewater presented testimony on estimated proved reserves from two experts, a geologist and a petroleum engineer. The gas reservoir projected by Tidewater’s experts had smaller boundaries than that arrived at by McDonald and Young, and roughly corresponded to the area common to the boundaries of McDonald and Young and those of the earlier Basin projection (ie., generally excluding any area that was not common to all those reserve projections presented by plaintiffs). The differences in the projections apparently arose from disagreements over interpretation of data from another well in the field, the existence and extent of a particular fault in the field, and the water level in the reservoir. Tidewater’s experts estimated the proved gas reserves at between 0.5 and 0.8 BCF, and projected that recovery of the reserves would result in a net loss, rather than a net profit.

The district court found Basin’s testimony to be more credible, 2 and found that “it was economically feasible to attempt to produce the proved reserves.” This finding was not clear error, in that there were competing permissible findings from the evidence presented. Tidewater argues that the court erred in failing to apply an adverse inference it had granted to Tidewater, where the inference involved data from a seismographic study of the gas field that Basin had not disclosed to Tidewater. It is not clear from the record that the court actually granted Tidewater’s request for an adverse inference, however. 3

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Anderson v. City of Bessemer City
470 U.S. 564 (Supreme Court, 1985)
King v. Illinois Central Railroad
337 F.3d 550 (Fifth Circuit, 2003)

Cite This Page — Counsel Stack

Bluebook (online)
139 F. App'x 605, Counsel Stack Legal Research, https://law.counselstack.com/opinion/basin-exploration-inc-v-tidewater-inc-ca5-2005.