This text of 217 S.W. 70 (Adair Drainage District v. Quincy, Omaha & Kansas City Railroad) is published on Counsel Stack Legal Research, covering Supreme Court of Missouri primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Adair Drainage District v. Quincy, Omaha & Kansas City Railroad, 217 S.W. 70, 280 Mo. 244, 1919 Mo. LEXIS 200 (Mo. 1919).

Opinions

This is a suit in mandamus to compel the appellant to remove obstructions in the Chariton River and to make openings in an embankment on its right of way. The embankment is without openings except a pipe three or four feet in diameter. The embankment commences about two hundred feet west of appellant's bridge over said river and extends thence southwesterly about one-half mile. It constitutes the south boundary line of the relator drainage district, and was built across the bed of an old lake or depression in the land, which was usually dry except in times of heavy rains, and was from five to ten feet lower than the bank of the river, for some distance north and south of the embankment. The drainage district extends north seven miles to the north line of Adair County and embraces about seven thousand acres of swamp or overflow land. The Chariton River runs in a tortuous and crooked course south through the district. The main ditch of the drainage district was built in 1911 and extends through the district from north to south, emptying into the river about four hundred feet north of appellant's bridge, on the east side of the river, where it bends to the west. This ditch was built across the land in the bends of the river, and was about twenty-eight feet wide and sixteen feet deep. The bottom of the river was generally about twelve feet lower than the bottom of the ditch. This plan of construction contemplated that when the river arose to the bottom of the ditch the water would flow through and wash and "scour" the ditch out and *Page 248 thus ultimately widen and deepen it. There had not been sufficient water in the river to flow through the ditch to any appreciable extent until the spring and summer of 1915, and it had caved in and dirt had accumulated in it to some extent at that time.

The charge in the alternative writ, among other things, is that in 1910 the railroad company wrongfully and negligently caused and permitted large amounts of drift-wood and other material to obstruct the flow of said river, near its said bridge, and in 1912 it wrongfully erected on its right-of-way a solid embankment from fifteen to twenty feet high from a point about two hundred feet west of said bridge to a point about one-half mile west thereof, where its tracks had previously been on piles and trestles, and did not construct openings through said embankment to connect with the drain or lowland running south of said railroad, so as to afford an outlet to drain and carry off the surface water accumulating on the lands within said district; that by reason thereof the flow of said river during stages of high water and the surface water accumulating on the lands embraced within said district from drainage, rain-fall and overflowing of said river in the months of June and July, 1915, were so obstructed that the water backed up and was caused to overflow the lands embraced within the drainage district and destroyed the crops thereon, and the ditches of relator were partially filled with sediment and the flow of water therein obstructed and said ditches rendered useless.

The return put the matters charged in the alternative writ in issue. Any new matter in the return was denied by the reply.

The evidence, in the main, sustained the allegations of the relator, and showed damage to the crops on some of the lands within the district, from the overflow complained *Page 249 of. There was evidence that the river had been obstructed a few years before by debris left in it when appellant's bridge was constructed, but that such obstructions had been substantially, but not entirely, removed. But the evidence failed to show any substantial damage to the ditch of the drainage district. In fact, one of the relator's witnesses testified that most of the ditches he saw were scoured out by the flood and were deeper and wider than they were before. There was no contradiction to this testimony. The embankment caused the water at times to be from sixteen to twenty-two inches higher on the north side than it was on the south side of the embankment, and to back the water up on the land north of it, where it stood for some days longer than it otherwise would have done. It also caused a current to run east along the embankment nearly or quite to the bridge, where it turned south and escaped with accelerated speed.

There was no allegation in the alternative writ and no evidence of any plans or specifications for bridges or other structures having been made by the drainage district engineer, or any one, or of the size or character of the openings through its embankment, which appellant would be compelled to make to comply with the peremptory writ. To remove the embankment and restore the trestle as it was before, the appellant's engineers estimated would cost $18,000. For this reason the Kansas City Court of Appeals, to which the appeal was taken, transferred the case to this court.

A plat showing the ditch, river, boundaries of the district and railroad right of way was introduced by relator. The material part of it, showing the south two miles or more of the ditch, is as follows: *Page 250

[EDITORS' NOTE: PLAT IS ELECTRONICALLY NON-TRANSFERRABLE.] *Page 251

After hearing the evidence the court granted the peremptory writ, which, following the alternative writ, commanded the appellant company to remove the obstructions in the river and "construct and maintain suitable openings" through said right-of-way and roadbed and ditches "along said railroad about one half mile westward from a point about two hundred feet west of said bridge over said Chariton River, to connect with drains and carry off the water, including surface water, that may accumulate on the land in said Adair Drainage District, so that such waters will not be obstructed in their flow, and that relator recover" costs, etc.

At the commencement of the trial, the appellant objected to the introduction of any evidence "for the reason that the alternative writ does not contain facts sufficient to constitute a cause of action against this respondent."

At the close of relator's testimony, the appellant moved "the court to quash the alternative writ of mandamus heretofore issued in this case and to dismiss this cause," which the court overruled, to which appellant excepted. This motion was renewed at the close of all the evidence, overruled and likewise excepted to.

I. Section 3150, Revised Statutes 1909, on which the proceeding seems to be based, at least in part, provides that it shall be the duty of every railroad company, within three months after the completion of its road, to cause to beSurface Water. constructed "suitable openings across and through the right of way and roadbed of such railroad . . . so as to afford sufficient outlet to drain and carry off the water, including surface water, along such railroad whenever the drainage of such water has been obstructed or rendered necessary by the construction of such railroad; and in case such corporation . . . shall fail" so to do "within the time limited in this article, any person owning land adjoining such railroad where such ditches or drains are necessary is hereby authorized, *Page 252

Free access — add to your briefcase to read the full text and ask questions with AI

Related

State ex rel. Purdy Reorganized School District No. II v. Snider
470 S.W.2d 805 (Missouri Court of Appeals, 1971)
State ex rel. University Park Building Corp. v. Henry
376 S.W.2d 614 (Missouri Court of Appeals, 1964)
State Ex Rel. Phillip v. Public School Retirement System
262 S.W.2d 569 (Supreme Court of Missouri, 1953)
Jones v. Chicago, Burlington & Quincy Railroad
125 S.W.2d 5 (Supreme Court of Missouri, 1939)
Hutchings v. Wabash Railway Co.
33 S.W.2d 147 (Missouri Court of Appeals, 1930)
State Ex Rel. Whitehead v. Wenom
32 S.W.2d 59 (Supreme Court of Missouri, 1930)
Farrar v. Shuss
282 S.W. 512 (Missouri Court of Appeals, 1926)
Sigler v. Inter-River Drainage District
279 S.W. 50 (Supreme Court of Missouri, 1925)
Anderson v. Inter-River Drainage & Levee District
274 S.W. 448 (Supreme Court of Missouri, 1925)
Coggins v. Atchison, Topeka & Santa Fe Railway Co.
256 S.W. 824 (Missouri Court of Appeals, 1923)
State Ex Rel. Bigham v. State Board of Embalming
250 S.W. 44 (Supreme Court of Missouri, 1923)
State Ex Rel. L. J. Mueller Furnace Co. v. Buckner
229 S.W. 392 (Missouri Court of Appeals, 1921)
Murphy v. St. Louis, San Francisco Railroad
226 S.W. 637 (Missouri Court of Appeals, 1920)
State Ex Rel. Law & Credit Co. v. Thomas
220 S.W. 702 (Missouri Court of Appeals, 1920)

Cite This Page — Counsel Stack

Bluebook (online)
217 S.W. 70, 280 Mo. 244, 1919 Mo. LEXIS 200, Counsel Stack Legal Research, https://law.counselstack.com/opinion/adair-drainage-district-v-quincy-omaha-kansas-city-railroad-mo-1919.