Counsel Stack
|
Law
Browse
Pricing
Counsel Stack
API Docs
Home
/
CFR
/
Title 46
/
Part 119
FEDERAL · 46 CFR
Part 119 — Machinery Installation
33 sections · Title 46: Shipping
§ 119.100
Intent; preemptive effect.
§ 119.115
Applicability to existing vessels.
§ 119.200
General.
§ 119.220
Installations.
§ 119.310
Installations.
§ 119.320
Water heaters.
§ 119.330
Pressure vessels.
§ 119.400
Applicability.
§ 119.405
Fuel restrictions.
§ 119.410
General requirements.
§ 119.420
Engine cooling.
§ 119.422
Integral and non-integral keel cooler installations.
§ 119.425
Engine exhaust cooling.
§ 119.430
Engine exhaust pipe installation.
§ 119.435
Integral fuel tanks.
§ 119.440
Independent fuel tanks.
§ 119.445
Fill and sounding pipes for fuel tanks.
§ 119.450
Vent pipes for fuel tanks.
§ 119.455
Fuel piping.
§ 119.458
Portable fuel systems.
§ 119.465
Ventilation of spaces containing diesel machinery.
§ 119.470
Ventilation of spaces containing diesel fuel tanks.
§ 119.500
General.
§ 119.510
Bilge piping system.
§ 119.520
Bilge pumps.
§ 119.530
Bilge high level alarms.
§ 119.540
Ballast systems.
§ 119.600
General.
§ 119.700
General.
§ 119.710
Piping for vital systems.
§ 119.715
Piping subject to more than 1,034 kPa (150 psig) in non-vital systems.
§ 119.720
Nonmetallic piping materials.
§ 119.730
Nonferrous metallic piping materials.