Counsel Stack
|
Law
Browse
Pricing
Counsel Stack
API Docs
Home
/
CFR
/
Title 36
/
Part 9
FEDERAL · 36 CFR
Part 9 — Minerals Management
97 sections · Title 36: Parks, Forests, and Public Property
§ 9.1
Purpose and scope.
§ 9.2
Definitions.
§ 9.3
Access permits.
§ 9.4
Surface disturbance moratorium.
§ 9.5
Recordation.
§ 9.6
Transfers of interest.
§ 9.7
Assessment work.
§ 9.8
Use of water.
§ 9.9
Plan of operations.
§ 9.10
Plan of operations approval.
§ 9.11
Reclamation requirements.
§ 9.12
Supplementation or revision of plan of operations.
§ 9.13
Performance bond.
§ 9.14
Appeals.
§ 9.15
Use of roads by commercial vehicles.
§ 9.16
Penalties.
§ 9.17
Public inspection of documents.
§ 9.18
Surface use and patent restrictions.
§ 9.30
What is the purpose and scope of this subpart?
§ 9.31
When does this subpart apply to me?
§ 9.32
What authorization do I need to conduct operations?
§ 9.33
If I am already operating under an NPS authorization, what do I need to do?
§ 9.40
What do the terms used in this subpart mean?
§ 9.50
Do I need an operations permit for my previously exempt operations?
§ 9.51
How do I apply for my operations permit?
§ 9.52
What will the NPS do with my application?
§ 9.53
May I continue to operate while the NPS reviews my application?
§ 9.60
When do I need a temporary access permit?
§ 9.61
How do I apply for a temporary access permit?
§ 9.62
When will the NPS grant a temporary access permit?
§ 9.63
How long will I have to conduct my reconnaissance surveys?
§ 9.70
Do I need an operations permit for accessing oil and gas rights from outside the System unit boundary?
§ 9.71
What information must I submit to the NPS?
§ 9.72
How will the NPS act on my submission?
§ 9.73
If I don't need an operations permit, are there still requirements that I must meet?
§ 9.80
Who must apply for an operations permit?
§ 9.81
May I use previously submitted information?
§ 9.82
What must I include in my application?
§ 9.83
What information must be included in all applications?
§ 9.84
Existing conditions and proposed area of operations.
§ 9.85
Environmental conditions and mitigation actions.
§ 9.86
Spill control and emergency preparedness plan.
§ 9.87
What additional information must be included if I am proposing geophysical exploration?
§ 9.88
What additional information must be included if I am proposing drilling operations?
§ 9.89
What additional information must be included if I am proposing well stimulation operations, including hydraulic fracturing?
§ 9.90
What additional information must be included if I am proposing production operations?
§ 9.100
How will NPS process my application?
§ 9.101
How will the NPS conduct initial review?
§ 9.102
How will the NPS conduct formal review?
§ 9.103
What standards must be met to approve my operations permit?
§ 9.104
What final actions may the Regional Director take on my operations permit?
§ 9.105
What is the approval process for operations in Big Cypress National Preserve?
§ 9.110
What are the purposes and functions of NPS operating standards?
§ 9.111
What general facility design and management standards must I meet?
§ 9.112
What hydrologic standards must I meet?
§ 9.113
What safety standards must I meet?
§ 9.114
What lighting and visual standards must I meet?
§ 9.115
What noise reduction standards must I meet?
§ 9.116
What reclamation and protection standards must I meet?
§ 9.117
What additional operating standards apply to geophysical operations?
§ 9.118
What additional operating standards apply to drilling, stimulation, and production operations?
§ 9.120
What terms and conditions apply to all operators?
§ 9.121
What monitoring and reporting is required for all operators?
§ 9.122
What additional reports must I submit if my operation includes hydraulic fracturing?
§ 9.130
May I cross Federal property to reach the boundary of my oil and gas right?
§ 9.131
Will the NPS charge me a fee for access?
§ 9.132
Will I be charged a fee for emergency access to my operations?
§ 9.140
Do I have to provide financial assurance to the NPS?
§ 9.141
How does the NPS establish the amount of financial assurance?
§ 9.142
Will the NPS adjust my financial assurance?
§ 9.143
When will the NPS release my financial assurance?
§ 9.144
Under what circumstances will the NPS retain my financial assurance?
§ 9.150
How can an approved permit be modified?
§ 9.160
What are my responsibilities if I transfer my operations?
§ 9.161
What must I do if operations are transferred to me?
§ 9.170
When must I plug my well?
§ 9.171
Can I get an extension to the well plugging requirement?
§ 9.180
What acts are prohibited under this subpart?
§ 9.181
What enforcement actions can the NPS take?
§ 9.182
How do violations affect my ability to obtain a permit?
§ 9.190
Can I, as operator, request reconsideration of NPS decisions?
§ 9.191
How does the NPS process my request for reconsideration?
§ 9.192
Can I appeal the Regional Director's decision?
§ 9.193
Will filing a request for reconsideration or appeal stop the NPS from taking action under this subpart?
§ 9.194
What if the original decision was made by the Superintendent?
§ 9.200
How can the public participate in the approval process?
§ 9.210
Has the Office of Management and Budget approved the information collection requirements?
§ 9.300
Purpose.
§ 9.301
Scope and applicability.
§ 9.302
Definitions.
§ 9.303
Coordination of AMRAP activities in National Park System units.
§ 9.304
Application requirements.
§ 9.305
Environmental compliance.
§ 9.306
Application review process and approval standards.
§ 9.307
Permitting requirements and standards.
§ 9.308
Permit modification, suspension, and cancellation.
§ 9.309
Appeals.