Counsel Stack
|
Law
Browse
Pricing
Counsel Stack
API Docs
Home
/
CFR
/
Title 30
/
Part 250
FEDERAL · 30 CFR
Part 250 — Oil and Gas and Sulphur Operations in the Outer Continental Shelf
486 sections · Title 30: Mineral Resources
§ 250.101
Authority and applicability.
§ 250.102
What does this part do?
§ 250.103
Where can I find more information about the requirements in this part?
§ 250.104
How may I appeal a decision made under BSEE regulations?
§ 250.105
Definitions.
§ 250.106
What standards will the Director use to regulate lease operations?
§ 250.107
What must I do to protect health, safety, property, and the environment?
§ 250.108
What requirements must I follow for cranes and other material-handling equipment?
§ 250.109
What documents must I prepare and maintain related to welding?
§ 250.110
What must I include in my welding plan?
§ 250.111
Who oversees operations under my welding plan?
§ 250.112
What standards must my welding equipment meet?
§ 250.113
What procedures must I follow when welding?
§ 250.114
How must I install, maintain, and operate electrical equipment?
§ 250.115
What are the procedures for, and effects of, incorporation of documents by reference in this part?
§ 250.116-250.117
§§ 250.116-250.117 [Reserved]
§ 250.118
Will BSEE approve gas injection?
§ 250.119
§ 250.119 [Reserved]
§ 250.120
How does injecting, storing, or treating gas affect my royalty payments?
§ 250.121
What happens when the reservoir contains both original gas in place and injected gas?
§ 250.122
What effect does subsurface storage have on the lease term?
§ 250.123
§ 250.123 [Reserved]
§ 250.124
Will BSEE approve gas injection into the cap rock containing a sulphur deposit?
§ 250.125
Service fees.
§ 250.126
Electronic payment instructions.
§ 250.130
Why does BSEE conduct inspections?
§ 250.131
Will BSEE notify me before conducting an inspection?
§ 250.132
What must I do when BSEE conducts an inspection?
§ 250.133
Will BSEE reimburse me for my expenses related to inspections?
§ 250.135
What will BSEE do if my operating performance is unacceptable?
§ 250.136
How will BSEE determine if my operating performance is unacceptable?
§ 250.140
When will I receive an oral approval?
§ 250.141
May I ever use alternate procedures or equipment?
§ 250.142
How do I receive approval for departures?
§ 250.143-250.144
§§ 250.143-250.144 [Reserved]
§ 250.145
How do I designate an agent or a local agent?
§ 250.146
Who is responsible for fulfilling leasehold obligations?
§ 250.150
How do I name facilities and wells in the Gulf of America Region?
§ 250.151
How do I name facilities in the Pacific Region?
§ 250.152
How do I name facilities in the Alaska Region?
§ 250.153
Do I have to rename an existing facility or well?
§ 250.154
What identification signs must I display?
§ 250.160-250.167
§§ 250.160-250.167 [Reserved]
§ 250.168
May operations or production be suspended?
§ 250.169
What effect does suspension have on my lease?
§ 250.170
How long does a suspension last?
§ 250.171
How do I request a suspension?
§ 250.172
When may the Regional Supervisor grant or direct an SOO or SOP?
§ 250.173
When may the Regional Supervisor direct an SOO or SOP?
§ 250.174
When may the Regional Supervisor grant or direct an SOP?
§ 250.175
When may the Regional Supervisor grant an SOO?
§ 250.176
Does a suspension affect my royalty payment?
§ 250.177
What additional requirements may the Regional Supervisor order for a suspension?
§ 250.180
What am I required to do to keep my lease term in effect?
§ 250.181-250.185
§§ 250.181-250.185 [Reserved]
§ 250.186
What reporting information and report forms must I submit?
§ 250.187
What are BSEE's incident reporting requirements?
§ 250.188
What incidents must I report to BSEE and when must I report them?
§ 250.189
Reporting requirements for incidents requiring immediate notification.
§ 250.190
Reporting requirements for incidents requiring written notification.
§ 250.191
How does BSEE conduct incident investigations?
§ 250.192
What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?
§ 250.193
Reports and investigations of possible violations.
§ 250.194
How must I protect archaeological resources?
§ 250.195
What notification does BSEE require on the production status of wells?
§ 250.196
Reimbursements for reproduction and processing costs.
§ 250.197
Data and information to be made available to the public or for limited inspection.
§ 250.198
Documents incorporated by reference.
§ 250.199
Paperwork Reduction Act statements—information collection.
§ 250.200
Definitions.
§ 250.201
What plans and information must I submit before I conduct any activities on my lease or unit?
§ 250.202
How must I protect the rights of the Federal government?
§ 250.203
Are there special requirements if my well affects an adjacent property?
§ 250.204
Requirements for high pressure high temperature (HPHT) barrier equipment.
§ 250.205
§ 250.205 [Reserved]
§ 250.206
What equipment does BSEE consider to be a barrier?
§ 250.207
How must barrier systems be used?
§ 250.208
How must I conduct activities under an approved EP, DPP, or DOCD?
§ 250.209
What must I do to conduct activities under the approved EP, DPP, or DOCD?
§ 250.210
Do I have to conduct post-approval monitoring?
§ 250.211
What are my new or unusual technology failure reporting requirements?
§ 250.212-250.219
§§ 250.212-250.219 [Reserved]
§ 250.220
What is the DWOP process?
§ 250.221
When must I use the DWOP process?
§ 250.222-250.224
§§ 250.222-250.224 [Reserved]
§ 250.225
What are the types of Conceptual Plans that I must submit?
§ 250.226
When and how must I submit each applicable Conceptual Plan?
§ 250.227
What must the Project Conceptual Plan contain?
§ 250.228
What must the New or Unusual Technology Conceptual Plan contain?
§ 250.229
What must the New or Unusual Technology Barrier Equipment Conceptual Plan include?
§ 250.230
When are you required to submit an I3P Report?
§ 250.231
What are your requirements for the Independent Third Party (I3P) nomination?
§ 250.232
What are the I3P review requirements for Conceptual Plan reviews?
§ 250.233
General requirements for any I3P Report.
§ 250.234
§ 250.234 [Reserved]
§ 250.235
When and how must I submit the DWOP?
§ 250.236
What information must I submit with the DWOP?
§ 250.237
What general information must my DWOP include?
§ 250.238
What well or completions information must my DWOP include?
§ 250.239
What structural information must my DWOP include?
§ 250.240
What production safety system information must my DWOP include?
§ 250.241
What subsea systems and pipeline information must my DWOP include?
§ 250.242
What New or Unusual Technology information must my DWOP include?
§ 250.243-250.244
§§ 250.243-250.244 [Reserved]
§ 250.245
May I combine the Project Conceptual Plan and the DWOP?
§ 250.246
When must I revise my DWOP?
§ 250.247
When must I supplement my DWOP?
§ 250.248
What information must I include in my Supplemental DWOP?
§ 250.300
Pollution prevention.
§ 250.301
Inspection of facilities.
§ 250.400
General requirements.
§ 250.401-250.403
§§ 250.401-250.403 [Reserved]
§ 250.404
What are the requirements for the crown block?
§ 250.405
What are the safety requirements for diesel engines used on a drilling rig?
§ 250.406
§ 250.406 [Reserved]
§ 250.407
What tests must I conduct to determine reservoir characteristics?
§ 250.408
May I use alternative procedures or equipment during drilling operations?
§ 250.409
May I obtain departures from these drilling requirements?
§ 250.410
How do I obtain approval to drill a well?
§ 250.411
What information must I submit with my application?
§ 250.412
What requirements must the location plat meet?
§ 250.413
What must my description of well drilling design criteria address?
§ 250.414
What must my drilling prognosis include?
§ 250.415
What must my casing and cementing programs include?
§ 250.416
What must I include in the diverter description?
§ 250.417
§ 250.417 [Reserved]
§ 250.418
What additional information must I submit with my APD?
§ 250.420
What well casing and cementing requirements must I meet?
§ 250.421
What are the casing and cementing requirements by type of casing string?
§ 250.422
When may I resume drilling after cementing?
§ 250.423
What are the requirements for casing and liner installation?
§ 250.424-250.426
§§ 250.424-250.426 [Reserved]
§ 250.427
What are the requirements for pressure integrity tests?
§ 250.428
What must I do in certain cementing and casing situations?
§ 250.430
When must I install a diverter system?
§ 250.431
What are the diverter design and installation requirements?
§ 250.432
How do I obtain a departure to diverter design and installation requirements?
§ 250.433
What are the diverter actuation and testing requirements?
§ 250.434
What are the recordkeeping requirements for diverter actuations and tests?
§ 250.440-250.451
§§ 250.440-250.451 [Reserved]
§ 250.452
What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations?
§ 250.455
What are the general requirements for a drilling fluid program?
§ 250.456
What safe practices must the drilling fluid program follow?
§ 250.457
What equipment is required to monitor drilling fluids?
§ 250.458
What quantities of drilling fluids are required?
§ 250.459
What are the safety requirements for drilling fluid-handling areas?
§ 250.460
What are the requirements for conducting a well test?
§ 250.461
What are the requirements for directional and inclination surveys?
§ 250.462
What are the source control, containment, and collocated equipment requirements?
§ 250.463
Who establishes field drilling rules?
§ 250.465
When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?
§ 250.466-250.469
§§ 250.466-250.469 [Reserved]
§ 250.470
What additional information must I submit with my APD for Arctic OCS exploratory drilling operations?
§ 250.471
What are the requirements for Arctic OCS source control and containment?
§ 250.472
What are the relief rig requirements for the Arctic OCS?
§ 250.473
What must I do to protect health, safety, property, and the environment while operating on the Arctic OCS?
§ 250.490
Hydrogen sulfide.
§ 250.500
General requirements.
§ 250.501
Definition.
§ 250.502
§ 250.502 [Reserved]
§ 250.503
Emergency shutdown system.
§ 250.504
Hydrogen sulfide.
§ 250.505
Subsea completions.
§ 250.506-250.508
§§ 250.506-250.508 [Reserved]
§ 250.509
Well-completion structures on fixed platforms.
§ 250.510
Diesel engine air intakes.
§ 250.511
Traveling-block safety device.
§ 250.512
Field well-completion rules.
§ 250.513
Approval and reporting of well-completion operations.
§ 250.514
Well-control fluids, equipment, and operations.
§ 250.515-250.517
§§ 250.515-250.517 [Reserved]
§ 250.518
Tubing and wellhead equipment.
§ 250.519
What are the requirements for casing pressure management?
§ 250.520
How often do I have to monitor for casing pressure?
§ 250.521
When do I have to perform a casing diagnostic test?
§ 250.522
How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?
§ 250.523
When do I have to repeat casing diagnostic testing?
§ 250.524
How long do I keep records of casing pressure and diagnostic tests?
§ 250.525
When am I required to take action from my casing diagnostic test?
§ 250.526
What do I submit if my casing diagnostic test requires action?
§ 250.527
What must I include in my notification of corrective action?
§ 250.528
What must I include in my casing pressure request?
§ 250.529
What are the terms of my casing pressure request?
§ 250.530
What if my casing pressure request is denied?
§ 250.531
When does my casing pressure request approval become invalid?
§ 250.600
General requirements.
§ 250.601
Definitions.
§ 250.602
§ 250.602 [Reserved]
§ 250.603
Emergency shutdown system.
§ 250.604
Hydrogen sulfide.
§ 250.605
Subsea workovers.
§ 250.606-250.608
§§ 250.606-250.608 [Reserved]
§ 250.609
Well-workover structures on fixed platforms.
§ 250.610
Diesel engine air intakes.
§ 250.611
Traveling-block safety device.
§ 250.612
Field well-workover rules.
§ 250.613
Approval and reporting for well-workover operations.
§ 250.614
Well-control fluids, equipment, and operations.
§ 250.615-250.618
§§ 250.615-250.618 [Reserved]
§ 250.619
Tubing and wellhead equipment.
§ 250.620
Wireline operations.
§ 250.700
What operations and equipment does this subpart cover?
§ 250.701
May I use alternate procedures or equipment during operations?
§ 250.702
May I obtain departures from these requirements?
§ 250.703
What must I do to keep wells under control?
§ 250.710
What instructions must be given to personnel engaged in well operations?
§ 250.711
What are the requirements for well-control drills?
§ 250.712
What rig unit movements must I report?
§ 250.713
What must I provide if I plan to use a mobile offshore drilling unit (MODU) for well operations?
§ 250.714
Do I have to develop a dropped objects plan?
§ 250.715
Do I need a global positioning system (GPS) for all MODUs?
§ 250.720
When and how must I secure a well?
§ 250.721
What are the requirements for pressure testing casing and liners?
§ 250.722
What are the requirements for prolonged operations in a well?
§ 250.723
What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow?
§ 250.724
What are the real-time monitoring requirements?
§ 250.730
What are the general requirements for BOP systems and system components?
§ 250.731
What information must I submit for BOP systems and system components?
§ 250.732
What are the independent third party requirements for BOP systems and system components?
§ 250.733
What are the requirements for a surface BOP stack?
§ 250.734
What are the requirements for a subsea BOP system?
§ 250.735
What associated systems and related equipment must all BOP systems include?
§ 250.736
What are the requirements for choke manifolds, kelly-type valves inside BOPs, and drill string safety valves?
§ 250.737
What are the BOP system testing requirements?
§ 250.738
What must I do in certain situations involving BOP equipment or systems?
§ 250.739
What are the BOP maintenance and inspection requirements?
§ 250.740
What records must I keep?
§ 250.741
How long must I keep records?
§ 250.742
What well records am I required to submit?
§ 250.743
What are the well activity reporting requirements?
§ 250.744
What are the end of operation reporting requirements?
§ 250.745
What other well records could I be required to submit?
§ 250.746
What are the recordkeeping requirements for casing, liner, and BOP tests, and inspections of BOP systems and marine risers?
§ 250.750
What are the coiled tubing requirements?
§ 250.751
Coiled tubing testing requirements.
§ 250.760
What are the snubbing requirements?
§ 250.800
General.
§ 250.801
Safety and pollution prevention equipment (SPPE) certification.
§ 250.802
Requirements for SPPE.
§ 250.803
What SPPE failure reporting procedures must I follow?
§ 250.804
§ 250.804 [Reserved]
§ 250.805
Hydrogen sulfide.
§ 250.806-250.809
§§ 250.806-250.809 [Reserved]
§ 250.810
Dry tree subsurface safety devices—general.
§ 250.811
Specifications for SSSVs—dry trees.
§ 250.812
Surface-controlled SSSVs—dry trees.
§ 250.813
Subsurface-controlled SSSVs.
§ 250.814
Design, installation, and operation of SSSVs—dry trees.
§ 250.815
Subsurface safety devices in shut-in wells—dry trees.
§ 250.816
Subsurface safety devices in injection wells—dry trees.
§ 250.817
Temporary removal of subsurface safety devices for routine operations.
§ 250.818
Additional safety equipment—dry trees.
§ 250.819
Specification for surface safety valves (SSVs).
§ 250.820
Use of SSVs.
§ 250.821
Emergency action and safety system shutdown—dry trees.
§ 250.822-250.824
§§ 250.822-250.824 [Reserved]
§ 250.825
Subsea tree subsurface safety devices—general.
§ 250.826
Specifications for SSSVs—subsea trees.
§ 250.827
Surface-controlled SSSVs—subsea trees.
§ 250.828
Design, installation, and operation of SSSVs—subsea trees.
§ 250.829
Subsurface safety devices in shut-in wells—subsea trees.
§ 250.830
Subsurface safety devices in injection wells—subsea trees.
§ 250.831
Alteration or disconnection of subsea pipeline or umbilical.
§ 250.832
Additional safety equipment—subsea trees.
§ 250.833
Specification for underwater safety valves (USVs).
§ 250.834
Use of USVs.
§ 250.835
Specification for all boarding shutdown valves (BSDVs) associated with subsea systems.
§ 250.836
Use of BSDVs.
§ 250.837
Emergency action and safety system shutdown—subsea trees.
§ 250.838
What are the maximum allowable valve closure times and hydraulic bleeding requirements for an electro-hydraulic control system?
§ 250.839
What are the maximum allowable valve closure times and hydraulic bleeding requirements for a direct-hydraulic control system?
§ 250.840
Design, installation, and maintenance—general.
§ 250.841
Platforms.
§ 250.842
Approval of safety systems design and installation features.
§ 250.843-250.849
§§ 250.843-250.849 [Reserved]
§ 250.850
Production system requirements—general.
§ 250.851
Pressure vessels (including heat exchangers) and fired vessels.
§ 250.852
Flowlines/Headers.
§ 250.853
Safety sensors.
§ 250.854
Floating production units equipped with turrets and turret-mounted systems.
§ 250.855
Emergency shutdown (ESD) system.
§ 250.856
Engines.
§ 250.857
Glycol dehydration units.
§ 250.858
Gas compressors.
§ 250.859
Firefighting systems.
§ 250.860
Chemical firefighting system.
§ 250.861
Foam firefighting systems.
§ 250.862
Fire and gas-detection systems.
§ 250.863
Electrical equipment.
§ 250.864
Erosion.
§ 250.865
Surface pumps.
§ 250.866
Personnel safety equipment.
§ 250.867
Temporary quarters and temporary equipment.
§ 250.868
Non-metallic piping.
§ 250.869
General platform operations.
§ 250.870
Time delays on pressure safety low (PSL) sensors.
§ 250.871
Welding and burning practices and procedures.
§ 250.872
Atmospheric vessels.
§ 250.873
Subsea gas lift requirements.
§ 250.874
Subsea water injection systems.
§ 250.875
Subsea pump systems.
§ 250.876
Fired and exhaust heated components.
§ 250.877-250.879
§§ 250.877-250.879 [Reserved]
§ 250.880
Production safety system testing.
§ 250.881-250.889
§§ 250.881-250.889 [Reserved]
§ 250.890
Records.
§ 250.891
Safety device training.
§ 250.892-250.899
§§ 250.892-250.899 [Reserved]
§ 250.900
What general requirements apply to all platforms?
§ 250.901
What industry standards must your platform meet?
§ 250.902
What are the requirements for platform removal and location clearance?
§ 250.903
What records must I keep?
§ 250.904
What is the Platform Approval Program?
§ 250.905
How do I get approval for the installation, modification, or repair of my platform?
§ 250.906
What must I do to obtain approval for the proposed site of my platform?
§ 250.907
Where must I locate foundation boreholes?
§ 250.908
What are the minimum structural fatigue design requirements?
§ 250.909
What is the Platform Verification Program?
§ 250.910
Which of my facilities are subject to the Platform Verification Program?
§ 250.911
If my platform is subject to the Platform Verification Program, what must I do?
§ 250.912
What plans must I submit under the Platform Verification Program?
§ 250.913
When must I resubmit Platform Verification Program plans?
§ 250.914
How do I nominate a CVA?
§ 250.915
What are the CVA's primary responsibilities?
§ 250.916
What are the CVA's primary duties during the design phase?
§ 250.917
What are the CVA's primary duties during the fabrication phase?
§ 250.918
What are the CVA's primary duties during the installation phase?
§ 250.919
What in-service inspection requirements must I meet?
§ 250.920
What are the BSEE requirements for assessment of fixed platforms?
§ 250.921
How do I analyze my platform for cumulative fatigue?
§ 250.1000
General requirements.
§ 250.1001
Definitions.
§ 250.1002
Design requirements for DOI pipelines.
§ 250.1003
Installation, testing, and repair requirements for DOI pipelines.
§ 250.1004
Safety equipment requirements for DOI pipelines.
§ 250.1005
Inspection requirements for DOI pipelines.
§ 250.1006
How must I decommission and take out of service a DOI pipeline?
§ 250.1007
What to include in applications.
§ 250.1008
Reports.
§ 250.1009
Requirements to obtain pipeline right-of-way grants.
§ 250.1010
General requirements for pipeline right-of-way holders.
§ 250.1011
§ 250.1011 [Reserved]
§ 250.1012
Required payments for pipeline right-of-way holders.
§ 250.1013
Grounds for forfeiture of pipeline right-of-way grants.
§ 250.1014
When pipeline right-of-way grants expire.
§ 250.1015
Applications for pipeline right-of-way grants.
§ 250.1016
Granting pipeline rights-of-way.
§ 250.1017
Requirements for construction under pipeline right-of-way grants.
§ 250.1018
Assignment of pipeline right-of-way grants.
§ 250.1019
Relinquishment of pipeline right-of-way grants.
§ 250.1150
What are the general reservoir production requirements?
§ 250.1151
How often must I conduct well production tests?
§ 250.1152
How do I conduct well tests?
§ 250.1153-250.1155
§§ 250.1153-250.1155 [Reserved]
§ 250.1156
What steps must I take to receive approval to produce within 500 feet of a unit or lease line?
§ 250.1157
How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?
§ 250.1158
How do I receive approval to downhole commingle hydrocarbons?
§ 250.1159
May the Regional Supervisor limit my well or reservoir production rates?
§ 250.1160
When may I flare or vent gas?
§ 250.1161
When may I flare or vent gas for extended periods of time?
§ 250.1162
When may I burn produced liquid hydrocarbons?
§ 250.1163
How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain?
§ 250.1164
What are the requirements for flaring or venting gas containing H<sub>2</sub>S?
§ 250.1165
What must I do for enhanced recovery operations?
§ 250.1166
What additional reporting is required for developments in the Alaska OCS Region?
§ 250.1167
What information must I submit with forms and for approvals?
§ 250.1200
Question index table.
§ 250.1201
Definitions.
§ 250.1202
Liquid hydrocarbon measurement.
§ 250.1203
Gas measurement.
§ 250.1204
Surface commingling.
§ 250.1205
Site security.
§ 250.1300
What is the purpose of this subpart?
§ 250.1301
What are the requirements for unitization?
§ 250.1302
What if I have a competitive reservoir on a lease?
§ 250.1303
How do I apply for voluntary unitization?
§ 250.1304
How will BSEE require unitization?
§ 250.1400
How does BSEE begin the civil penalty process?
§ 250.1401
§ 250.1401 [Reserved]
§ 250.1402
Definitions.
§ 250.1403
What is the maximum civil penalty?
§ 250.1404
Which violations will BSEE review for potential civil penalties?
§ 250.1405
When is a case file developed?
§ 250.1406
When will BSEE notify me and provide penalty information?
§ 250.1407
How do I respond to the letter of notification?
§ 250.1408
When will I be notified of the Reviewing Officer's decision?
§ 250.1409
What are my appeal rights?
§ 250.1450
What definitions apply to this subpart?
§ 250.1451
What may BSEE do if I violate a statute, regulation, order, or lease term relating to a Federal oil and gas lease?
§ 250.1452
What if I correct the violation?
§ 250.1453
What if I do not correct the violation?
§ 250.1454
How may I request a hearing on the record on a Notice of Noncompliance?
§ 250.1455
Does my request for a hearing on the record affect the penalties?
§ 250.1456
May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance?
§ 250.1460
May I be subject to penalties without prior notice and an opportunity to correct?
§ 250.1461
How will BSEE inform me of violations without a period to correct?
§ 250.1462
How may I request a hearing on the record on a Notice of Noncompliance regarding violations without a period to correct?
§ 250.1463
Does my request for a hearing on the record affect the penalties?
§ 250.1464
May I request a hearing on the record regarding the amount of a civil penalty if I did not request a hearing on the Notice of Noncompliance?
§ 250.1470
How does BSEE decide what the amount of the penalty should be?
§ 250.1471
Does the penalty affect whether I owe interest?
§ 250.1472
How will the Office of Hearings and Appeals conduct the hearing on the record?
§ 250.1473
How may I appeal the Administrative Law Judge's decision?
§ 250.1474
May I seek judicial review of the decision of the Interior Board of Land Appeals?
§ 250.1475
When must I pay the penalty?
§ 250.1476
Can BSEE reduce my penalty once it is assessed?
§ 250.1477
How may BSEE collect the penalty?
§ 250.1480
May the United States criminally prosecute me for violations under Federal oil and gas leases?
§ 250.1500
Definitions.
§ 250.1501
What is the goal of my training program?
§ 250.1503
What are my general responsibilities for training?
§ 250.1504
May I use alternative training methods?
§ 250.1505
Where may I get training for my employees?
§ 250.1506
How often must I train my employees?
§ 250.1507
How will BSEE measure training results?
§ 250.1508
What must I do when BSEE administers written or oral tests?
§ 250.1509
What must I do when BSEE administers or requires hands-on, simulator, or other types of testing?
§ 250.1510
What will BSEE do if my training program does not comply with this subpart?
§ 250.1600
Performance standard.
§ 250.1601-250.1634
§ 250.1601-250.1634 [Reserved]
§ 250.1700
What do the terms “decommissioning,” “obstructions,” “facility,” and “predecessor” mean in this subpart?
§ 250.1701
Who must meet the decommissioning obligations in this subpart?
§ 250.1702
When do I accrue decommissioning obligations?
§ 250.1703
What are the general requirements for decommissioning?
§ 250.1704
What decommissioning applications and reports must I submit and when must I submit them?
§ 250.1705-250.1707
§§ 250.1705-250.1707 [Reserved]
§ 250.1708
How will BSEE enforce accrued decommissioning obligations against predecessors?
§ 250.1709
§ 250.1709 [Reserved]
§ 250.1710
When must I permanently plug all wells on a lease?
§ 250.1711
When will BSEE order me to permanently plug a well?
§ 250.1712
What information must I submit before I permanently plug a well or zone?
§ 250.1713
§ 250.1713 [Reserved]
§ 250.1714
What must I accomplish with well plugs?
§ 250.1715
How must I permanently plug a well?
§ 250.1716
To what depth must I remove wellheads and casings?
§ 250.1717
§ 250.1717 [Reserved]
§ 250.1721
If I temporarily abandon a well that I plan to re-enter, what must I do?
§ 250.1722
If I install a subsea protective device, what requirements must I meet?
§ 250.1723
What must I do when it is no longer necessary to maintain a well in temporary abandoned status?
§ 250.1725
When do I have to remove platforms and other facilities?
§ 250.1726
When must I submit an initial platform removal application and what must it include?
§ 250.1727
What information must I include in my final application to remove a platform or other facility?
§ 250.1728
To what depth must I remove a platform or other facility?
§ 250.1729
After I remove a platform or other facility, what information must I submit?
§ 250.1730
When might BSEE approve partial structure removal or toppling in place?
§ 250.1731
Who is responsible for decommissioning an OCS facility subject to an Alternate Use RUE?
§ 250.1740
How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions?
§ 250.1741
If I drag a trawl across a site, what requirements must I meet?
§ 250.1742
What other methods can I use to verify that a site is clear?
§ 250.1743
How do I certify that a site is clear of obstructions?
§ 250.1750
When may I decommission a pipeline in place?
§ 250.1751
How do I decommission a pipeline in place?
§ 250.1752
How do I remove a pipeline?
§ 250.1753
After I decommission a pipeline, what information must I submit?
§ 250.1754
When must I remove a pipeline decommissioned in place?
§ 250.1900
Must I have a SEMS program?
§ 250.1901
What is the goal of my SEMS program?
§ 250.1902
What must I include in my SEMS program?
§ 250.1903
Acronyms and definitions.
§ 250.1904
Special instructions.
§ 250.1905-250.1908
§§ 250.1905-250.1908 [Reserved]
§ 250.1909
What are management's general responsibilities for the SEMS program?
§ 250.1910
What safety and environmental information is required?
§ 250.1911
What hazards analysis criteria must my SEMS program meet?
§ 250.1912
What criteria for management of change must my SEMS program meet?
§ 250.1913
What criteria for operating procedures must my SEMS program meet?
§ 250.1914
What criteria must be documented in my SEMS program for safe work practices and contractor selection?
§ 250.1915
What training criteria must be in my SEMS program?
§ 250.1916
What criteria for mechanical integrity must my SEMS program meet?
§ 250.1917
What criteria for pre-startup review must be in my SEMS program?
§ 250.1918
What criteria for emergency response and control must be in my SEMS program?
§ 250.1919
What criteria for investigation of incidents must be in my SEMS program?
§ 250.1920
What are the auditing requirements for my SEMS program?
§ 250.1921
What qualifications must the ASP meet?
§ 250.1922
What qualifications must an AB meet?
§ 250.1923
§ 250.1923 [Reserved]
§ 250.1924
How will BSEE determine if my SEMS program is effective?
§ 250.1925
May BSEE direct me to conduct additional audits?
§ 250.1926
§ 250.1926 [Reserved]
§ 250.1927
What happens if BSEE finds shortcomings in my SEMS program?
§ 250.1928
What are my recordkeeping and documentation requirements?
§ 250.1929
What are my responsibilities for submitting OCS performance measure data?
§ 250.1930
What must be included in my SEMS program for SWA?
§ 250.1931
What must be included in my SEMS program for UWA?
§ 250.1932
What are my EPP requirements?
§ 250.1933
What procedures must be included for reporting unsafe working conditions?